Z1DA--612A4-19-016 | Renovate Outpatient Pharmacy and HVAC
- Response deadline
- Jul 20, 2026 Due in 2 days
- Date posted
- Jul 17, 2026
- Source
- Open notice
Description
AMENDMENT OF SOLICITAITON/MODIFICATION OF CONTRACT PAGE NO. CONTINUATION PAGE 2 SOLICITATION NO: 36C26126R0036 ORDER NO: AMENDMENT NO: 0005 14. DESCRIPTION OF AMENDMENT/MODIFICATION (CONTINUED) The purpose of this amendment is to answer three additional RFIs. Section 01 00 00 requires the project schedule to include a minimum of forty-five (45) days for VAÂ relocation of Pharmacy Services into the completed temporary facilities, and a minimum of forty-five (45) days for VA relocation of staff, equipment, and operations from the temporary facilities back into Building 650 upon completion of the renovated outpatient pharmacy suite. Please confirm: (a) whether both 45-day VA relocation periods are included within the 540-calendar-day period of performance; and (b) whether contract completion for purposes of the period of performance is measured at Government acceptance of the renovated pharmacy suite, or upon completion of temporary facility removal and complete site restoration following the VA's 45-day relocation back into Building 650. ANSWER: The 540-calendar-day Contract Time includes both 45-calendar-day VA relocation periods. Contract completion is achieved upon completion of all Contract Work, including removal of the temporary facilities and complete site restoration following the VA's final relocation back into Building 650. "Construction start date" refers to commencement of on-site construction activities, including temporary facility construction. This requirement applies to construction-phase submittals required to perform the Work and does not include closeout submittals (e.g., O&M manuals, as-built drawings) or finish selections not required before installation. Section 01 00 00 states: 100% of ALL project submittals shall be approved prior to the construction start date. Please clarify whether construction start date refers to (a) commencement of temporary facility construction, or (b) commencement of renovation work within Building 650. Please also confirm whether closeout-phase submittals (e.g., O&M manuals, as-built drawings) and late-phase finish material submittals are included in this requirement, or whether it applies to construction-phase submittals only. GLBA appreciates the Government's attention to these questions and remains available for any clarification needed. ANSWER: "Construction start date" refers to commencement of on-site construction activities, including temporary facility construction. This requirement applies to construction-phase submittals required to perform the Work and does not include closeout submittals (e.g., O&M manuals, as-built drawings) or finish selections not required before installation. One of our drywall trade partners has brought up a conflict they have found on the existing walls at the perimeter of the pharmacy. Per wall type Mbb3 on Sheet A-501 at the corridor it appears that the framing is existing and one new layer of board, the security mesh fire safing and a closure angle is required to be installed. How we would install the 3 slip track at an existing wall? Are they to be cut between the existing studs and fastened to the bottom of the roof deck? Please advise if the slip track is needed. ANSWER: Install the head-of-wall/slip-track assembly at the existing wall by attaching the slip track to the structure above as required to maintain the specified assembly. Existing studs are not required to be removed or modified except as necessary to complete the installation. ///////////////////////////////////////////////LAST ITEM//////////////////////////////////////////////////
Classifications
Documents (39)
- 1- RFI answers - 36C26126R0036 - Pharmacy - 612A4-19-016.xlsx.xlsx41 KBNot yet available
- 8. Sheet G007_w Stamp.pdf.pdf153 KBNot yet available
- 36C26126R0036 0002.docx.docx402 KBNot yet available
- Brand Name Justification.pdf.pdf259 KBNot yet available
- 9- Site Visit log.jpeg.jpeg3.5 MBNot yet available
- S02 RFI FORM.docx.docx19 KBNot yet available
- 3. 015000.01 Temporary Facilities and Controls - Pharmacy Trailer_CHANGES.docx.docx43 KBNot yet available
- DIVISIONAL COST BREAK-OUT.docx.docx16 KBNot yet available
- 12. VA Provided Vault door cut sheet.pdf.pdf2.0 MBNot yet available
- 10. Spec Section 09 06 00 Schedof Finishes.docx.docx44 KBNot yet available
- 4. 013216.15 Project Sched. Small - CA Edits.docx.docx46 KBNot yet available
- 14. 087100 Door Hardware.docx.docx207 KBNot yet available
- 1. 000110 TOC.docx.docx43 KBNot yet available
- 19-103 DWGs 100 BD 20231012 .pdf.pdf30.3 MBNot yet available
- 19-103 Specs 100percent BD 20231108 .pdf.pdf5.4 MBNot yet available
- 11. Sheets I-001, I-101, and I-401.pdf.pdf2.2 MBNot yet available
- 8- VHA ICRA_612A4-19-016 Bid.pdf.pdf329 KBNot yet available
- 36C26126R0036 0003.docx.docx16 KBNot yet available
- 36C26126R0036 0001.docx.docx16 KBNot yet available
- SAFETY - ENVIRONMENTAL RECORD AND EXPERIENCE MODIFICATION RATE.docx.docx16 KBNot yet available
- 4- Pre-Inspection Submittals Checklist to Bidders.xlsx.xlsx23 KBNot yet available
- 5. 013323 Shop Drawings-CA Edits.docx.docx219 KBNot yet available
- 19-103 SubReg 100percent BD 20231013 .pdf.pdf16.6 MBNot yet available
- 7- B650 As builts 2014.pdf.pdf12.9 MBNot yet available
- 2- 087100 Door Hardware.docx.docx207 KBNot yet available
- 36C26126R0036 0004.docx.docx43 KBNot yet available
- 3- 281300-Physical access control SYStem.doc.doc365 KBNot yet available
- 36C26126R0036_2.docx.docx131 KBNot yet available
- 7. Sheet G-006_-signed.pdf.pdf561 KBNot yet available
- Past Performance Questionnaire.docx.docx34 KBNot yet available
- 5- EQUIPMENT AND FURNITURE SCHEDULE_TEMPORARY TRAILER.xlsx.xlsx21 KBNot yet available
- 0. Adendum to 19-103 Specs 100percent BD 20231108 -sumary of changes-.doc.doc43 KBNot yet available
- VAAR 852.219-75.docx.docx17 KBNot yet available
- 9. NorCal Finish Standards 2025.pdf.pdf3.8 MBNot yet available
- 6- Utilty Map- Canteen Parking Lot.pdf.pdf371 KBNot yet available
- 13. 070150.19 PrepReRoof.docx.docx48 KBNot yet available
- 6. Sheet ES101 - ELECTRICAL SITE PLAN_SEALED_signed.pdf.pdf2.6 MBNot yet available
- 2. 010000 - General Requirements - CAEdits.docx.docx66 KBNot yet available
- 36C26126R0036 0005.docx.docx31 KBNot yet available
Contacts
- Jose A Hernandez