SAM.gov140P6426B0008
Open
Z--ZION- Crawford Dam Removal and Diversion
- Response deadline
- Jul 8, 2026 Closed
- Date posted
- Jun 25, 2026
- Source
- Open notice
Description
The purpose of this amendment is to: 1. Post the sign in sheet from the site visit. All else remains unchanged Acknowledge the amendment on the SF30 of in the appropriate block on the SF1442
Classifications
Documents (10)
- DownloadB08_Solicitation_-_Bid_Schedule.xlsx.xlsx23 KB
- DownloadSol_140P6426B0008_Amd_0002.pdf.pdf201 KB
- DownloadB08_Solicitation_-_Limitations_on_Subcontracting_Report.xlsx.xlsx89 KB
- DownloadA06_Drawings.pdf.pdf8.0 MB
- DownloadQuestions_and_Answers_-_Crawford_Dam_Removal_0001.pdf.pdf264 KB
- DownloadB08_Solicitation_-_DOL_Wage_Determination.pdf.pdf1.6 MB
- DownloadSol_140P6426B0008.pdf.pdf999 KB
- DownloadCrawford_PrebidSiteVisit_20260520_0002.pdf.pdf283 KB
- DownloadSol_140P6426B0008_Amd_0001.pdf.pdf201 KB
- DownloadA06_Specifications.pdf.pdf3.9 MB
Contacts
Similar contracts
- Design-Bid-Build, Dredging at JEBLC Fuel Pier and Anzio Beach Sandbar, and JEBFS Utah Beach Sandbar, Joint Expeditionary Base Little Creek - Fort Story, Virginia Beach, VADue Sep 1, 2026
- Fy26 Houston Ship Channel, Texas Bayport Flare Hopper DredgingDue Oct 2, 2026
- Chickasaw County, Mississippi, Mississippi Delta Headwaters Project, Bank Stabilization 23-01
- NAICS 237990 PSC Y1PZ--CONS: 909CM3030 Fort Custer NC - Cemetery Expansion and Site ImprovementsMichiganDue Sep 17, 2026
- Sand Trail Phase IIAlaskaDue Sep 10, 2026
- Gulf Intracoastal Waterway, Texas High Island to Causeway and Channel to Port Bolivar Pipeline Maintenance DredgingTexasDue Sep 15, 2026