Civic AI
Civic AI
Procurement intelligence
SAM.gov140P8626R0002
Open

Z--REPLACE ROOFS AND VENTS FORT CRONKHITE, GOGA

INTERIOR, DEPARTMENT OF THE
Response deadline
Jul 9, 2026
Closed
Date posted
Jul 6, 2026

Description

REPLACE ROOFS AND VENTS FORT CRONKHITE, GOGA This Amendment 0004 is issued to effect the following changes: 1. Revise Attachment 15 to include updated Questions & Answers. 2. All other terms and conditions remain unchanged. This Amendment 0003 is issued to effect the following changes: 1. Disregard Attachment 3 Drawings 140P8626R0003 as this was inadvertently included in the attachments and not a part of this project (there is no replacement Attachment 3). Refer to Attachment 4 Drawings Flue for this project. 2. All other terms and conditions remain unchanged. This Amendment 0002 is issued to effect the following changes: 1. Include Attachment 15 Questions & Answers 24 June 2026. 2. Include the Site Visit Sign-In Sheet 24 June 2026 3. All other terms and conditions remain unchanged. This Amendment 0001 is issued to effect the following changes: 1. The site visit, originally scheduled for Wednesday, June 24, 2026, at 10:00 AM PDT, will now be held on the same date at 11:00 AM PDT. 2. All other terms and conditions remain unchanged. The Department of the Interior, National Park Service, Golden Gate National Recreation Area, has a requirement to replace roofs and vents at Fort Cronkite and Gutter Guards at Fort Barry. The work of this contract consists of supervision, labor, equipment, testing, and supplies required for the removal and replacement of roofs on four buildings, vents on ten roofs, options for vents on three buildings at Fort Cronkhite, and options for gutter guards on two buildings at Fort Barry.

Classifications

Documents (22)

  • B08_Att_04_Drawings_Flue_1057___FC_1058_11-19-2019_3_shts.pdf
    .pdf293 KB
    Download
  • Sol_140P8626R0002_Amd_0003.pdf
    .pdf201 KB
    Download
  • B08_Att_10_PSP_Vol_II_52_209-13_140P8626R0002.docx
    .docx24 KB
    Download
  • B08_Att_09_PSP_Vol_I_PastPerf_140P8626R0002.docx
    .docx47 KB
    Download
  • B08_Att_06_PSP_Cover_140P8626R0002.docx
    .docx30 KB
    Download
  • B08_Att_01_Construction_Specifications_140P8626R0002.pdf
    .pdf1004 KB
    Download
  • B08_Att_14_PSP_Vol_II_SF24_140P8626R0002.pdf
    .pdf720 KB
    Download
  • B08_Att_05_WD_CA20260007_mod_3_rev_23_Jan_2026.pdf
    .pdf100 KB
    Download
  • Sol_140P8626R0002.pdf
    .pdf830 KB
    Download
  • B11_Site_Visit_Sign_In_Sheet_140P8626R0002_0002.pdf
    .pdf173 KB
    Download
  • Sol_140P8626R0002_Amd_0001.pdf
    .pdf201 KB
    Download
  • B08_Att_08_PSP_Vol_I_KeyPers_140P8626R0002.docx
    .docx19 KB
    Download
  • Sol_140P8626R0002_Amd_0004.pdf
    .pdf201 KB
    Download
  • B08_Att_15_Questions___Answers_140P8626R0002_24_June_2026_0002.pdf
    .pdf214 KB
    Download
  • B08_Att_02_Fort_Cronkhite_Map_1.pdf
    .pdf961 KB
    Download
  • B08_Att_12_PSP_Vol_II_GenRefs_140P8626R0002.docx
    .docx32 KB
    Download
  • B08_Att_07_PSP_Vol_I_Exp_140P8626R0002.docx
    .docx40 KB
    Download
  • Sol_140P8626R0002_Amd_0002.pdf
    .pdf201 KB
    Download
  • B08_Att_03_Drawings_140P8626R0003.pdf
    .pdf10.1 MB
    Download
  • B08_Att_13_PSP_Vol_II_LOS_140P8626R0002.xlsx
    .xlsx89 KB
    Download
  • B08_Att_11_PSP_Vol_II_52_222-38_140P8626R0002.docx
    .docx22 KB
    Download
  • Att_15_Questions___Answers_140P8626R0002_REVISED_6_July_2026_0004.pdf
    .pdf250 KB
    Download

Contacts

Explore more