SAM.gov140P2026B0003
Open
Z--Rehabilitation of Water and Wastewater System
- Response deadline
- Jul 30, 2026 Closed
- Date posted
- Jul 20, 2026
- Source
- Open notice
Description
This is a SSN for the purpose of conducting Market Research. Proposals are NOT being requested, nor accepted at this time. This amendment serves to provide corrections to the previous issued SSN to correct the NAICS code requirement. This construction project consists of replacing and rehabilitating aging water, wastewater, electrical, mechanical, and SCADA infrastructure at Curecanti National Recreation Area, primarily at the Elk Creek and Lake Fork areas, with additional SCADA improvements at Iola. The work includes new and replacement utility piping, lift station improvements, septic and lagoon system work, generator connections, controls/telemetry upgrades, and associated site restoration, pavement repair, and utility coordination.
Classifications
Documents (4)
- A14_SSN_r1_RELEASED_v2_May2026_2.docx.docx60 KBNot yet available
- A14_SSN_RELEASED_v2_May2026_1.pdf.pdf212 KBNot yet available
- A14_SSN_Survey_Questionnaire_Attachment_1_RELEASED_v2_July2026_1.docx.docx60 KBNot yet available
- A14_SSN_Survey_Questionnaire-r1-Attachment_1_RELEASED_v2_July2026_(1)_2.docx.docx57 KBNot yet available
Contacts
Similar contracts
- J045--Terminate - Isolate 8-inch Steam PipelineNorth CarolinaDue Aug 19, 2026
- Z--BLRI -PERFORM MAINT. ON THE PISGAH WWTPDue Aug 31, 2026
- Repair Water Tower B738TexasDue Sep 2, 2026
- Sole Source for Irrigation line at Moore Air BaseTexasDue Aug 20, 2026
- LC-3535 Sewer Line RepairsDue Sep 8, 2026
- Z--GATE-REPAIR C-LOT PUMP STATION-SHUDue Aug 27, 2026