SAM.gov140P6426B0004
Open
Z--Munising Falls Trail Rehabilitation
- Response deadline
- Jul 1, 2026 Closed
- Date posted
- Jun 23, 2026
- Source
- Open notice
Description
The purpose of this amendment is to: 1. Change the due date for bids from 24 June 2026 to 1 July 2026 2. Provide answers to the technical questions asked after the site visit. All else remains unchanged.
Classifications
Documents (11)
- DownloadB08_Solicitation_-_Drawings_PIRO_226930.pdf.pdf27.2 MB
- DownloadSol_140P6426B0004_Amd_0001.pdf.pdf201 KB
- DownloadB08_Solicitation_-_Drawings_-_Bid_Option_1.pdf.pdf6.7 MB
- DownloadQuestions_and_Answers_-_MFT_-_PIRO_0001.pdf.pdf301 KB
- DownloadB08_Solicitation_-_Limitations_on_Subcontracting_Report.xlsx.xlsx89 KB
- DownloadB08_Solicitation_-__Specifications_-_PIRO_226930.pdf.pdf18.9 MB
- DownloadB08_Solicitation_-__ADDENDUM_1.pdf.pdf11.4 MB
- DownloadB08_Solicitation_-_Statement_of_Structural_Tests_and_Special_Inspections.pdf.pdf449 KB
- DownloadB08_Solicitation_-_DOL_Wage_Determination.pdf.pdf1.8 MB
- DownloadSol_140P6426B0004.pdf.pdf1.1 MB
- DownloadB08_Solicitation_-_Bid_Schedule.xlsx.xlsx23 KB
Contacts
Similar contracts
- Design-Bid-Build, Dredging at JEBLC Fuel Pier and Anzio Beach Sandbar, and JEBFS Utah Beach Sandbar, Joint Expeditionary Base Little Creek - Fort Story, Virginia Beach, VADue Sep 1, 2026
- Fy26 Houston Ship Channel, Texas Bayport Flare Hopper DredgingDue Oct 2, 2026
- Chickasaw County, Mississippi, Mississippi Delta Headwaters Project, Bank Stabilization 23-01
- NAICS 237990 PSC Y1PZ--CONS: 909CM3030 Fort Custer NC - Cemetery Expansion and Site ImprovementsMichiganDue Sep 17, 2026
- Sand Trail Phase IIAlaskaDue Sep 10, 2026
- Gulf Intracoastal Waterway, Texas High Island to Causeway and Channel to Port Bolivar Pipeline Maintenance DredgingTexasDue Sep 15, 2026