SAM.gov140R1026R0005
Open
Z--Grand Coulee WPP - RAHCO Crane Modernization
- Response deadline
- Aug 10, 2026 Closed
- Date posted
- Jul 8, 2026
- Source
- Open notice
Description
Work is located at Grand Coulee Dam Nathaniel Washington Power Plant (WPP), approximately 80 miles west of Spokane, WA, in Okanogan County, which is also within the Colville Confederate Tribe's Tribal Lands.
Classifications
Documents (3)
- Sources_Sought_140R1026R0005_Grand_Coulee_1.docx.docx134 KBNot yet available
- Non-Disclosure_Agreement_1.pdf.pdf303 KBNot yet available
- Interim_Final_Grand_Coulee_WPP_RAHCO_Crane_Modernization_1.pdf.pdf24.9 MBNot yet available
Contacts
- cclifford@usbr.gov2088091372
Similar contracts
- Design-Bid-Build, Dredging at JEBLC Fuel Pier and Anzio Beach Sandbar, and JEBFS Utah Beach Sandbar, Joint Expeditionary Base Little Creek - Fort Story, Virginia Beach, VADue Sep 1, 2026
- Fy26 Houston Ship Channel, Texas Bayport Flare Hopper DredgingDue Oct 2, 2026
- Chickasaw County, Mississippi, Mississippi Delta Headwaters Project, Bank Stabilization 23-01
- NAICS 237990 PSC Y1PZ--CONS: 909CM3030 Fort Custer NC - Cemetery Expansion and Site ImprovementsMichiganDue Sep 17, 2026
- Sand Trail Phase IIAlaskaDue Sep 10, 2026
- Gulf Intracoastal Waterway, Texas High Island to Causeway and Channel to Port Bolivar Pipeline Maintenance DredgingTexasDue Sep 15, 2026