SAM.gov140R2026R0017
Open
Z--Folsom Warehouse Bridge Crane Replacement
- Response deadline
- Oct 9, 2026 Due in 13 days
- Date posted
- Sep 26, 2026
- Source
- Open notice
Description
The purpose of this requirement is to design, build, furnish and install one 30 ton bridge crane to replace the existing bridge crane in the Folsom Dam Warehouse. The purpose of this Amendment is to provide the Second Site Visit Attendance List, and the additional Questions and Answers.
Classifications
Documents (34)
- C06_01_Attachment_9_-_Pre-Proposal_Meeting_Agenda_8_5_2026_0003.pdf.pdf165 KBNot yet available
- C05_04_Attachment_8_-_RFP_Checklist_7_11_2026.pdf.pdf118 KBNot yet available
- 26_08_00_-_Commissioning_of_Electrical_Equipment_Amend_0004_0004.pdf.pdf193 KBNot yet available
- C05_04_RFP-140R2026R0017_SF1442_7_31_2026.pdf.pdf2.6 MBNot yet available
- C05_04__Attachment_1_-_SOW_7_1_2026.pdf.pdf21.9 MBNot yet available
- C05_04_Attachment_7_-_PPQ_6_30_2026.docx.docx38 KBNot yet available
- 25_12_10_-_Programmable_Logic_Controller_Amend_0004_0004.pdf.pdf202 KBNot yet available
- 26_05_02_-_Basic_Electrical_Materials_and_Methods_Amend_0004_0004.pdf.pdf151 KBNot yet available
- Attachment_13_-_Folsom_Warehouse_Crane_Site_Visit_0004.pdf.pdf311 KBNot yet available
- 00_01_10_-_Table_of_Contents_Amend_0004_0004.pdf.pdf96 KBNot yet available
- Amendment_No__5_Questions-Answers_9_25_2026_0005.pdf.pdf149 KBNot yet available
- RFQ-140R2026R0017_SF1442_9_2_2026_0004.pdf.pdf2.9 MBNot yet available
- Sol_140R2026R0017_Amd_0003.pdf.pdf203 KBNot yet available
- 25_00_01_-_Automation_Control_System_Amend_0004_0004.pdf.pdf248 KBNot yet available
- Attachment_2_-_FolsomCraneMod_11x17_Amend_0004_0004.pdf.pdf31.7 MBNot yet available
- 52_00_00_-_Drawings_Amend_0004_0004.pdf.pdf150 KBNot yet available
- Sol_140R2026R0017_Amd_0005.pdf.pdf210 KBNot yet available
- Folsom_Warehouse_Crane_-_Site_Visit_2_Attendance_0005.pdf.pdf56 KBNot yet available
- 41_22_14_-_Bridge_Crane_Amend_0004_0004.pdf.pdf249 KBNot yet available
- C05_04_Attachment_3_-_Wage_Determination_6_22_2026.pdf.pdf15.0 MBNot yet available
- Sol_140R2026R0017.pdf.pdf283 KBNot yet available
- 01_33_00_-_Submittals_Amend_0004_0004.pdf.pdf542 KBNot yet available
- 41_22_15_-_Bridge_Crane_Electrical_Components_Amend_0004_0004.pdf.pdf299 KBNot yet available
- C06_01_Attachment_10_Virtual_Folsom_Dam_Warehouse_Crane_8_5_2026_0003.pdf.pdf2.0 MBNot yet available
- C05_04_Attachment_6_-_Risk_Assessment-Value_Add_7_14_2026.docx.docx22 KBNot yet available
- Attachment_12_Questions_and_Answers_9_1_2026_0004.pdf.pdf606 KBNot yet available
- Sol_140R2026R0017_Amd_0004.pdf.pdf210 KBNot yet available
- Sol_140R2026R0017_Amd_0001.pdf.pdf202 KBNot yet available
- 41_22_13_-_Removal_of_Existing_Cranes_Amend_0004_0004.pdf.pdf146 KBNot yet available
- Attachment_11_-_RFP_Checklist_9_1_2026_0004.pdf.pdf118 KBNot yet available
- C05_04_Attachment_5_-_LOS_6_24_2026.xlsx.xlsx13 KBNot yet available
- C05_04_Attachment_4_-_Release_of_Claims_6_23_2026.pdf.pdf331 KBNot yet available
- Section_J_9_25_2026_0005.pdf.pdf218 KBNot yet available
- Sol_140R2026R0017_Amd_0002.pdf.pdf202 KBNot yet available
Contacts
- stephanie_lindner@ios.doi.gov916-591-0194
Similar contracts
- KC-46A ADAL Apron and Hydrant Fueling PitsDue Oct 23, 2026
- LARO 258755 - Replace Dilapidated Docks and Fuel SDue Nov 11, 2026
- National Enterprise Dredging Center Scope Dredge to Budget Shallow DraftTexasDue Oct 5, 2026
- NAICS 237990 PSC Y1PZ--CONS: 909CM3030 Fort Custer NC - Cemetery Expansion and Site ImprovementsMichiganDue Oct 2, 2026
- Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)Due Oct 26, 2026
- GIWW Freeport to Matagorda Maintenance DredgingDue Oct 13, 2026