Z--DK Heart Butte Dam Safety Modification
- Response deadline
- May 29, 2026 Closed
- Date posted
- Apr 24, 2026
- Source
- Open notice
Description
DK Heart Butte Dam Safety Modification Please see the attachments entitled "Solicitation 140R6026R0004 0002 4.24.26" and "03B_00 00 02_Drawings 11x17 4.23.26" for the full solicitation details. Please also see the following attachments for more supporting documentation relating to this solicitation: Geology Package_Rev 04-21-26 8530-2018-54_Geotech Lab_Conduit Sediment 8550-2020-06_Heart Butte Dam Lab Testing Report 8550-2024-25_Heart Butte FD Borrow TM 8550-2025-02 Geotechnical Laboratory in Support of Final Design Modifications Heart Butte Dam Heart Butte Dam 2024 Final Design Geologic Investigations A copy of the 2018-2021 Heart Butte Dam Corrective Action Study Geologic Exploration Report and the Revised Geology Package (4.21.2026) can be requested from the Contracting Specialist at mitchell_frost@ios.doi.gov.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- Small Business Multiple Award Task Order Contract (MATOC) for the Missouri River Bank Stabilization and Navigation Project (BSNP)
- FWS - Pixley NWR Water Recirculation Design-BuildDue Nov 30, 2026
- Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less Than 24-Inch Diameter) Fully Operated with Attendant Plant and Personnel, and with a Draft not to Exceed 9 Feet, for Construction and Maintenance Dredging - JBJ WaterwayMississippiDue Nov 16, 2026
- Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less Than 18-Inch Diameter) Fully Operated with Attendant Plant and Personnel, and with a Draft not to Exceed 9 Feet, for Construction and Maintenance Dredging - MS River HarborsMississippiDue Nov 16, 2026
- St. Lucie South Jetty Repair Industry DayFloridaDue Dec 7, 2026
- Repair Aids to Navigation (ATON) - Southern Area of USCG District NortheastConnecticutDue Dec 8, 2026