SAM.gov140P5326R0020
Open
Z--Blri -Perform Maint. on the Pisgah Wwtp
- Response deadline
- Aug 7, 2026 Closed
- Date posted
- Jul 16, 2026
- Source
- Open notice
Description
PERFORM MAINT. ON THE PISGAH WASTEWATER SYSTEM IN BLUE RIDGE PARKWAY THE PURPOSE OF THIS AMENDMENT TO ANNOUNCE A SECOND SITE VISIT DATE.
Classifications
Documents (8)
- A05_ATTACHMENT_002_-_SPECIFICATIONS.pdf.pdf157 KBNot yet available
- Sol_140P5326R0020.pdf.pdf661 KBNot yet available
- A06_ATTACHMENT_003_-_PROJECT_PLANS.pdf.pdf28.7 MBNot yet available
- B03_ATTACHMENT_004_-_Wage_Rate_Determination.pdf.pdf1.8 MBNot yet available
- B04_ATTACHMENT_006_-_Construction_Contract_Administration.docx.docx13 KBNot yet available
- A04_ATTACHMENT_001_-_STATEMENT_OF_WORK.pdf.pdf269 KBNot yet available
- B08_ATTACHMENT_005_-_Past_Performance_Questionnaire.pdf.pdf285 KBNot yet available
- Sol_140P5326R0020_Amd_0001.pdf.pdf203 KBNot yet available
Contacts
- marilia_mateo@ios.doi.gov470-819-0933
Similar contracts
- Install Sewer Lift Station Pumps and Controls, Stoneville, MississippiMississippiDue Sep 15, 2026
- NRM-CON-663A4-27-001 Under Dispenser Containment (UDC) and sump installation at VAMC American LakeDue Sep 11, 2026
- Yellowstone - Mammoth Water Line ReplacementDue Sep 15, 2026
- Y--2026 Marcott Coulee PipelineDue Sep 10, 2026
- MAHG251029 Repair Water Tower #8MississippiDue Sep 15, 2026
- Norwood Horse Pasture WellColoradoDue Sep 22, 2026