Z--Alpo Stabilization of Staple Bend Tunnel
- Response deadline
- Oct 30, 2026 Due in 25 days
- Date posted
- Oct 5, 2026
- Source
- Open notice
Description
Allegheny Portage Railroad National Historical Site (ALPO) - Tunnel Stabilization of Staple Bend Tunnel Amendment 0002 - Addresses Contractor asked Questions, and INCLUDES UPDATES SCHEDULE, SPECIFICATIONS and T&Cs (Sections B-M) that shall be used instead of the original Section B-M attached to SF-1442. It also includes two (2) additional attachments that will be included with the award that are needed to address contractor asked questions. CONTRACTORS are reminded that they need to be registered as a Small Business concern in their SAM Reps and Certs under the NAICS - 237990 - Other Heavy and Civil Engineering Construction as stated in Section L and M under Factor 2- Sub-Factor A. IF THIS NAICS CODE IS MISSING FROM YOUR SAM PROFILE UNDER YOUR REPS AND CERTS IT NEEDS TO BE ADDED BEFORE YOU SUBMIT ANY RESPONSE TO SOLICITATION. Amendment 0001 extends the closing date and time to Friday, October 30, 2026 by no later than 1600 Mountain Time. The full solicitation is now posted in SAM.gov, including all related documents. An organized site visit has been scheduled for: Wednesday, August 26, 2026, at 10 AM Eastern. Participants will meet at: Staple Bend Tunnel - Trailhead Parking Lot (For specific directions see Section C.5) 1258 Beech Hill Road Johnstown, PA 15942 A NPS shuttle will either transport and/or lead a limited number of vehicles from the Trailhead Parking Lot to the site. Any contractors that arrive late, and miss the shuttle departure, will have to make the 2-mile hike on their own. They will NOT be allowed to drive to the site location on the trail leading to the Staple Bend Tunnel on their own once shuttle has departed.
Classifications
Documents (17)
- B08_-_Attachment_2_-_ALPO-Staple_Bend_Tunnel-Drawings_-_7_31_2025.pdf.pdf8.5 MBNot yet available
- B08_-_Attachment_4_-_Location_Maps-Lab_Testing_Report-Photos.pdf.pdf25.1 MBNot yet available
- B08_-_Attachment_6_-_ALPO_Staple_Bend_Tunnel_Preservation-1999_CDs.pdf.pdf3.4 MBNot yet available
- B09_-_Amend_0002_-_Attachment_11_-_Tecco_0002.pdf.pdf193 KBNot yet available
- Sol_140P4226R0026_Amd_0001.pdf.pdf202 KBNot yet available
- B08_-_Attachment_8_-_CON_WD_-_PA20260002_-_Heavy_and_Highway_-_7_30_2026.pdf.pdf724 KBNot yet available
- B08_-_Attachment_10_-_Proposal_Submission_Package_-_140P4226R0026.docx.docx32 KBNot yet available
- B09_-_140P4226R0026_-_Amendment_0002_-_Questions_and_Answers_0002.pdf.pdf370 KBNot yet available
- B08_-_Attachment_5_-146798-ALPO-423-41023-Topo.pdf.pdf4.6 MBNot yet available
- B08_-_Attachment_7_-_ALPO_Staple_Bend_Tunnel_-_Submittal_List.xlsx.xlsx28 KBNot yet available
- Sol_140P4226R0026_Amd_0002.pdf.pdf203 KBNot yet available
- B09_-_Amend_0002_-_Updated_Schedule-Specifications_and_T_Cs_0002.pdf.pdf1.0 MBNot yet available
- B08_-_Attachment_1_-_ALPO-Staple_Bend_Tunnel-Specs-Final_-_7_12_2026.pdf.pdf1.5 MBNot yet available
- B08_-_Attachment_3_-_ALPO-Staple_Bend_Tunnel-Technical_Reports.pdf.pdf29.0 MBNot yet available
- Sol_140P4226R0026.pdf.pdf739 KBNot yet available
- B08_-_Attachment_9_-_Limitations_on_Subcontracting_compliance_worksheet.xlsx.xlsx160 KBNot yet available
- B09_-_Amend_0002_-_Attachment_12_-_1991_GEI_Geotechnical_Report_-_SBT_0002.pdf.pdf17.2 MBNot yet available
Contacts
- brian_mccabe@ios.doi.gov2023397772
Similar contracts
- Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance ChannelDue Oct 13, 2026
- Y--JELA 325250 335621 - Rehabilitate Chalmette National Cemetery at Jean Lafitte N
- NAICS 237990 PSC Y1PZ--CONS: 909CM3030 Fort Custer NC - Cemetery Expansion and Site ImprovementsMichiganDue Oct 6, 2026
- Notice of Intent to ConsolidateDue Oct 12, 2026
- Bayou Meto Canal 1000, Phase 4.1, Check StructureDue Nov 5, 2026
- Osceola Harbor Dredging Extension