Civic AI
Civic AI
Procurement intelligence
SAM.govW9127N26BA029_
Open

Yaquina Overhaul FY27

Response deadline
Aug 17, 2026
Closed
Date posted
Aug 11, 2026

Description

10 August 2026 - Amendment 2 Solicitation (SF 30), Performance Work Statement Amend 1, Wage Determinations for potential locations, and drawing "527 000 00 03 S4K Geislinger Coupling Gear" added to attachments. The PWS was amended to include new information under Section M, Evaluation Factors for Award, to include but not limited to, information regarding Location Adjustments. Additionally, another drawing was attached regarding Reduction Gear overhaul section 5.11.2 of the PWS. Wage Determinations for potential work locations have also been added. However, the awardee will recieve the official WD for this contract upon award, as the location is still unknown currently. 7 August 2026 - Ship Check 0900, 10 August 2026 vessel will be docked at Terminal 2 Portland, OR during this period. 27 July 2026 - Ship Check 0900, 11 August 2026 vessel will be conducting operational dredging between Terminal 2, Portland, OR and Port of Astoria, OR during this period. Interested attendees shall provide notice to the Contract Specialist three days prior to the visit for a firm meeting location. 24 July 2026 - Amendment 1 solicitation (SF 30), Performance Work Statement, and Price Schedule added to attachments. Section 5.7.2, Bow Thruster - Inspection, Oil, and Seal Change, has been moved to CAT B. Otherwise, all changes within PWS will show a strike through of previous information and new information in red text. 23 July 2026 - Removed incorrect attachment and replaced with correct attachment. Both Labeled "Hundstead Technical Manual for Marine Gear CPG 12". PLEASE NOTE: If you downloaded the attachment before 12:15P Pacific on 23July that is the incorrect copy and you will need to obtain the correct copy which is now attached. 22 July 2026 - Updating to add reference materials as mentioned within the PWS. The U.S. Army Corps of Engineers (USACE), Portland District, intends to award a firm fixed price Job Order under a Master Ship and Repair Agreement (MSRA) for overhaul, maintenance, and repair to the Dredge YAQUINA. Major work items that may be associated with the overhaul and dry docking can be found at the bottom of this announcement. The complete list can be found within the attached invitation for bid (IFB). SITE VISIT (Ship Check): For a Contractor to be determined responsible and eligible for award, a representative of the contractor MUST attend one of the available site visits. The dates for the site visits are: 21 July 26 – Coos Bay, Oregon Note: More site visit dates TBD If a Contractor would like to request a different day to meet their travel requirements, that can be arranged with 5 days of advanced notice. The actual pickup locations will be confirmed within 3 days of each visit, with the vessel location intended to be no more than 90 minutes away from Portland, Oregon. Site visits will begin promptly at 9:00 AM Pacific Time. All offerors will be required to wear Personal Protective and Safety Equipment (PPE) that meets the requirements of EM 385-1-. 1. PPE WILL NOT be provided by USACE. The Dredge Yaquina is currently in the operational dredge season. Due to the current operational schedule, the details for the location of the site visit dates above are subject to change. To schedule a site visit, please contact Ms. Jaren Bowman at Jaren.L.Bowman@usace.army.mil. Some of the potential locations will require a Transportation Worker Identification Certification (TWIC) card to obtain entry, if you do or do not have a TWIC card, please make the Point of Contact aware of this information. All overhaul work shall be performed at the Contractor's facility. The Government will deliver the vessel to the contractor facility. Upon completion of the overhaul, USACE personnel will conduct dock and sea trials which the vessel must pass prior to delivery and acceptance of the vessel back to the Government. Prospective contractors must have, or be capable of, entering into an MSRA with USACE, Portland District. Every prospective contractor that wishes to be considered for the award of the job order from this IFB must have an active MSRA with Portland District prior to award. If a prospective contractor wishes to submit a bid for this job order and has not already entered into a MSRA for overhaul of the vessel with the Portland District, then please contact Ms. Jaren Bowman at Jaren.L.Bowman@usace.army.mil. This IFB is issues on a full and open competition basis in electronic format only. Paper copies of this IFB will not be available. Bidders shall submit their bids via email to Ian Lutjens at ian.k.lutjens@usace.army.mil and Jaren Bowman at Jaren.L.Bowman@usace.army.mil no later than the date and time established in Block 9 of the standard Form (SF) 33, or Block 14 of the most recently issued SF30 as applicable. Each email shall contain the following information: Solicitation number: W9127N26BA029 Bid Due Date & Time: 17 August 2026, 2:30 PM Bid Validity: 01 November 2026 NOTE: Additional submission instructions are included in the SF33. Dredge Yaquina is a trailing arm suction hopper dredge built in 1980. It has the following Characteristics: Length Overall 200 Feet Length between perpendiculars 188 Feet Beam Molded 58 Feet Beam Overall (With Drag Arms Lowered) 70 Feet Registered Gross Tonnage 2001 Long Tons Normal Light, Draft Forward 6'-7" Normal Light, Draft Aft 10'-3" Class ABS Loadline The American Bureaus of Shipping International Load Line Certificate will be endorsed during this availability. The Drydock Examination, Internal Structural Review and the Annual Inspection for renewal of the U.S. Coast Guard Certificate of Inspection will be performed during this availability. The NAICS Code is 336611; PSC Code J999.

Classifications

Documents (64)

  • MDC 353-E507-2012-01 Revision A Dredge Pipe Arrangement.pdf
    .pdf299 KB
    Download
  • MDC 353-E645-2012-05 Revision A Pump Cofferdam.pdf
    .pdf210 KB
    Download
  • IHC 50412077 RR Gate Valve.pdf
    .pdf355 KB
    Download
  • DTC 5241127 Sliding Piece.pdf
    .pdf4.4 MB
    Download
  • NORSHIPCO Y-1032-16 General Arrangement.pdf
    .pdf953 KB
    Download
  • NORSHIPCO Y-2494-3 Revision E Sheets 1 to 2 Hopper Plating.pdf
    .pdf492 KB
    Download
  • Y-1034-17 Docking Plan.pdf
    .pdf2.2 MB
    Download
  • MTU Series 60 Service Manual.pdf
    .pdf18.0 MB
    Download
  • NORSHIPCO Y-2232-9 Revision F Sheets 1 to 2 Tank Top Plating.pdf
    .pdf525 KB
    Download
  • NORSHIPCO Y-2232-19 Upper Deck Plating and Beams.pdf
    .pdf1.2 MB
    Download
  • LIPS-A004654.pdf
    .pdf278 KB
    Download
  • Performance Work Statment_amend1_10AUG2026_FINAL.pdf
    .pdf1.9 MB
    Download
  • D-1441-1 Revision G- CO2 Fire Extinguishing Smoke Detection Systems.PDF
    .pdf1.1 MB
    Download
  • NORSHIPCO Y-2232-42 Revision B Sheets 1 to 5 Miscellaneous Tanks.pdf
    .pdf8.1 MB
    Download
  • NORSHIPCO Y-2272-1 Revision C Sheets 1 to 2 Chain Locker Details.pdf
    .pdf497 KB
    Download
  • Solicitation - W9127N26BA029.pdf
    .pdf5.7 MB
    Download
  • 527 000 00 03 S4K Geislinger Coupling Gear.pdf
    .pdf4.2 MB
    Download
  • NORSHIPCO Y-2494-1 Revision C Sheets 1 to 2 Hopper Door Frames.pdf
    .pdf2.3 MB
    Download
  • Y-2496-2 Arrgt and Details Hopper Doors Operating Gear.pdf
    .pdf3.5 MB
    Download
  • Performance Work Statement_YAQ OH_Amend1_7.24.26.pdf
    .pdf1.8 MB
    Download
  • NORSHIPCO Y-1032-16 Revision K Sheets 1 to 6 General Arrangement.pdf
    .pdf953 KB
    Download
  • NORSHIPCO Y-2232-18 Revision C Sheets 1 to 2 Arrangement Details of Bow Thruster.pdf
    .pdf1.8 MB
    Download
  • Hundested Dwg 1-022-020409 Installation Unit.pdf
    .pdf301 KB
    Download
  • NORSHIPCO Y-2274-2 Arrangement-Details of Rudder Stock Tiller-Tiebar.pdf
    .pdf1.0 MB
    Download
  • NORSHIPCO Y-2496-2 Revision E Sheets 1 to 3 Arrangement.pdf
    .pdf3.5 MB
    Download
  • Manufacturer Operating and Maintenance Manual for the Specific Capstan Unit.pdf
    .pdf5.3 MB
    Download
  • NORSHIPCO Y-2232-44 Revision D Sheets 1 to 2 Sea Chests.pdf
    .pdf560 KB
    Download
  • MTU 12V2000 Service Manual.pdf
    .pdf12.6 MB
    Download
  • Attachment A_Price Schedule_amend1 7.24.26.xlsx
    .xlsx79 KB
    Download
  • SCA WD 2015-5535_Snohomish County WA.pdf
    .pdf98 KB
    Download
  • Hundested Technical Manual for Marine Gear CPG 12.pdf
    .pdf1.3 MB
    Download
  • Ned-Deck Marine Operation Maintenance Manual SCH Rev E 14-12-2010.pdf
    .pdf3.8 MB
    Download
  • VD-TM-91721 incl drawings (OM) Manual.pdf
    .pdf1.6 MB
    Download
  • USACE Drawing 353-E330-024 Gear Foundation Mods.pdf
    .pdf83 KB
    Download
  • SCA WD 2015-5563_Multnomah County OR.pdf
    .pdf98 KB
    Download
  • New England Trawler Equipment Co Capstan-Windlass Manual.pdf
    .pdf6.2 MB
    Download
  • NORSHIPCO Y-2496-1 Revision C Sheets 1 to 2 Hopper Door- Frames.pdf
    .pdf2.3 MB
    Download
  • SCA WD_2015-5623_Alameda CA.pdf
    .pdf98 KB
    Download
  • Red Hawk FA-101- Fire Alarm System Dredge YAQUINA FAS Layout.pdf
    .pdf2.9 MB
    Download
  • Y-2496-2 Door Operating Gear.pdf
    .pdf3.5 MB
    Download
  • MDC 353-A640-01 Revision B Sheets 1 to 3 Engine Cooling System.pdf
    .pdf481 KB
    Download
  • NORSHIPCO Y-1034-2 Alum Doors.pdf
    .pdf6.5 MB
    Download
  • DTC 5241115 Trunnion.pdf
    .pdf2.7 MB
    Download
  • NORSHIPCO Y-2636-1 Shaft Struts.pdf
    .pdf482 KB
    Download
  • NORSHIPCO Y-2274-1 Rudders.pdf
    .pdf524 KB
    Download
  • Example Report for SCBAs.PDF
    .pdf183 KB
    Download
  • NORSHIPCO Y-1034-2 Revision F Sheets 1 to 9 List of Doors Hatches Scuttles Manho.pdf
    .pdf1.1 MB
    Download
  • NORSHIPCO Y-2636-2 Shafting Arrangement.pdf
    .pdf254 KB
    Download
  • Hundested 0-002-020932-2 MP700 Propeller Hoved Samling.pdf
    .pdf713 KB
    Download
  • DT50-55 Tech Manual.pdf
    .pdf8.4 MB
    Download
  • Red Hawk FA-000 - Fire Alarm System Dredge YAQUINA General Notes Information.pdf
    .pdf5.1 MB
    Download
  • Y-1034-1 Top of Hopper.pdf
    .pdf4.0 MB
    Download
  • Solicitation Amendment W9127N26BA0290002 SF 30.pdf
    .pdf3.8 MB
    Download
  • MTU 8V4000 Service Manual.pdf
    .pdf50.0 MB
    Download
  • USACE Y-1052-1 Revision G Arrangement and Details of Zinc Anodes.pdf
    .pdf36 KB
    Download
  • Maintenance Manual for SCBAs - Drager Servicing.pdf
    .pdf581 KB
    Download
  • NORSHIPCO Y-3878-18 HVAC - Upper DK Deck House.pdf
    .pdf923 KB
    Download
  • Grid Cooler Installation and Maintenance Manual Form 185.pdf
    .pdf5.5 MB
    Download
  • Lips A0 04654 Revision A Assembly Fixed Pitch Transverse Thruster.pdf
    .pdf278 KB
    Download
  • Y-2494-3 Hopper Framing.pdf
    .pdf489 KB
    Download
  • MDC 353-E507-2012-05 Dredge Pipe Flanges Gaskets.pdf
    .pdf84 KB
    Download
  • D-1441-2- Layout Smoke Detection System.PDF
    .pdf3.5 MB
    Download
  • SCA WD 2015-5687_Kenai Peninsula AK.pdf
    .pdf98 KB
    Download
  • Solicitation Amendment W9127N26BA0290001 SF 30.pdf
    .pdf3.8 MB
    Download

Contacts

Similar contracts

Explore more