Civic AI
Civic AI
Procurement intelligence
SAM.gov36C24226R0060
Open

Y1DA--630A4-26-401 MRI AHU Modification

Response deadline
Aug 7, 2026
Closed
Date posted
Jul 23, 2026

Description

36C24226R0060 Amendment 3 630A4-26-401 MRI AHU Modification 6. Per our teams meeting this morning, please see below RFI's; There are 3 potential options for the MRI chiller: Air cooled package at grade with glycol and pump package. Air cooled package at grade using glycol but also using a plate and frame heat exchanger to separate the glycol from the clear water. Air cooled split chiller with outdoor condenser and indoor evaporator using clear water only. Does The VA have a preference for which system works better for them? The scope of work calls for an inline pump to serve the fan coil units. Can the VA share the reason for these extra pumps as series pumping can present issues. If the additional head is included in the new chiller pumps does that suffice? There are 6 new fan coil units called for in the corridor. This is 9 tons of cooling. Does the corridor have that kind of a load? Typically, corridors are only lighting and a few transient people. Also, if 9 tons is used for fan coil units, is 21 tons sufficient for the MRI Load? COR answer(s): It appears that Option 2 may be the more effective choice; however, as this is a design-build project, we rely on the A/E team s expertise to design the system in accordance with VA requirements and specifications. Accordingly, a series pump configuration is not considered an acceptable design. The A/E team should perform its own heat load calculation for the corridor to determine the required cooling capacity. The VA has provided only general information; it is the contractor s design team s responsibility to determine the actual requirements and verify whether the chiller recommended by the VA is sufficient.

Classifications

Documents (20)

  • S02 INSTRUCTIONS TO BIDDERS REGARDING TAX EXEMPTION IN NY 2.1.docx
    .docx18 KBNot yet available
  • S02 FAR DEVIATION FEB 2025 NOTICE 2.1.docx
    .docx15 KBNot yet available
  • S02 SAFETY AND ENVIRONMENTAL RECORD 2.1.docx
    .docx16 KBNot yet available
  • P02 Drawings.pdf
    .pdf3.0 MBNot yet available
  • 36C24226R0060 0001.docx
    .docx19 KBNot yet available
  • S02 AUTODESK Contractors Access Instructions 1.1.pdf
    .pdf1.1 MBNot yet available
  • S02 LIMITATION ON SUBCONTRACTING 2.1.docx
    .docx16 KBNot yet available
  • SOW 12152025.docx
    .docx39 KBNot yet available
  • 36C24226R0060_1.docx
    .docx124 KBNot yet available
  • 36C24226R0060 0002.docx
    .docx19 KBNot yet available
  • S02 Privacy Training for Personnel without Access to VA Computer 1.1.pdf
    .pdf62 KBNot yet available
  • S02 Participation Goals for Minorities and Females 2.1.pdf
    .pdf414 KBNot yet available
  • SCA 2015_4187_34 12032025.docx
    .docx7.8 MBNot yet available
  • Phase II Proposals.docx
    .docx22 KBNot yet available
  • S02 Specifications.pdf
    .pdf607 KBNot yet available
  • S02 Supplement A though C.pdf
    .pdf616 KBNot yet available
  • S02 52.225-2 BUY AMERICAN CERTIFICATE 2.1.docx
    .docx16 KBNot yet available
  • WD NY20260003 01302026.docx
    .docx5.5 MBNot yet available
  • 36C24226R0060 0003.docx
    .docx19 KBNot yet available
  • Instructions to Offers.docx
    .docx352 KBNot yet available

Contacts

Similar contracts

Explore more