Y--OLYM - FAIRHOLME CG ABAAS IMPROVEMENTS
- Response deadline
- Aug 18, 2026 Due in 1 day
- Date posted
- Aug 2, 2026
- Source
- Open notice
Description
The National Park Service (NPS) Olympic National Park (OLYM) in Clallam County, Washington, has a requirement to make ABAAS improvements and construct family restroom foundations at Fairholme Campground. 1. The work of this contract consists of constructing: a.) 12'x12' foundation, floor slab, retaining wall, and apron/sidewalks for Loop A comfort station. Stairs, ABAAS ramp, and handrails on the Loop A comfort station. b.) 12'x12' foundation, floor slab, and comfort station apron/sidewalks for the Loop B Comfort Station. c.) Make necessary rough in utility connections for family restroom foundations. d.) New or improved ABAAS trails connecting sites 3,4,16,45,69 including crosswalk for site 16. e.) ABAAS improvements to campsites 3,4,16,45,69. f.) Remove, Repair, and Reinstall signboards at comfort station Loop A and Loop B. 2. Option Items May include: a. Construct ABAAS crosswalk and trail connecting campsite 3 to Loop A comfort station trail. Asphalt pave parking areas for campsites 3 and 4. b. Construct ABAAS crosswalk and trail connecting campsite 69 to Loop B comfort station trail. Asphalt pave parking areas for campsites 45 and 69.
Classifications
Documents (19)
- DownloadAmendment_2_0002.pdf.pdf336 KB
- DownloadB08_Attachment_11_52_222-38_Response_Form_-_Copy.pdf.pdf138 KB
- DownloadB08_Attachment_09_Past_Performance_Questionnaire_-_Copy.docx.docx47 KB
- DownloadB08_Attachment_07_Project_Experience_Questionnaire_-_Copy_(2).docx.docx40 KB
- DownloadB08_Attachment_08_Key_Personnel_Experience_-_Copy.docx.docx23 KB
- DownloadB08_Attachment_02_Existing_Condition_Photos_-_Copy.pdf.pdf3.9 MB
- DownloadB08_Attachment_06_Proposal_Submission_Package_Cover_Page_and_Table_of_Contents.pdf.pdf105 KB
- DownloadB08_Attachment_10_52_209-13_Response_Form_-_Copy.pdf.pdf178 KB
- DownloadB08_Attachment_14_Standard_Form_24__Bid_Bond_-_Copy_-_Copy.pdf.pdf720 KB
- DownloadB08_Attachment_01_Specifications_SOW_Fairholme_CG_ABAAS_Improvements_-_Copy.pdf.pdf361 KB
- DownloadB08_Attachment_04_Construction_Wage_Determination_SAM_-_Copy.pdf.pdf200 KB
- DownloadSol_140P8326R0006_Amd_0001.pdf.pdf202 KB
- DownloadB09_Amendment_01_Attachment_1_Site_Visit_Discussion_Notes_140P8326R0006_0001.pdf.pdf137 KB
- DownloadB08_Attachment_03_Fairholme_Campground_ABAAS_Improvements_and_Family_Restroom_Foundations_Drawings_-_Copy.pdf.pdf7.9 MB
- DownloadB08_Attachment_12_General_References_-_Copy_(2).pdf.pdf104 KB
- DownloadB08_Attachment_05_Price_Schedule_and_Forms_to_Submit_with_Proposal_-_Copy.pdf.pdf441 KB
- DownloadSol_140P8326R0006.pdf.pdf840 KB
- DownloadSol_140P8326R0006_Amd_0002.pdf.pdf202 KB
- DownloadB08_Attachment_13_Subcontracting_Percentage_Worksheet_-_Copy_-_Copy.xlsx.xlsx89 KB
Contacts
Similar contracts
- FIELDS POINT COMPOSTING TOILETS UNIT INSTALLATION OKANOGAN-WENATCHEE NATIONAL FORESTWashingtonDue Aug 28, 2026
- ODF-H FY26 Asbestos Abatement and DemolitionNebraskaDue Aug 26, 2026
- Demo Mini mute sitesSouth CarolinaDue Aug 21, 2026
- Whatcom Ritter Road Equipment Rental with OperatorWashingtonDue Aug 21, 2026
- New Hogan Dam and Lake Restroom Replacement, Valley Springs, CA.CaliforniaDue Sep 1, 2026
- Cockreham Island Emergency Levee Repair – Equipment w/ OperatorWashingtonDue Aug 17, 2026