Civic AI
Civic AI
Procurement intelligence
SAM.gov140P8326R0006
Open

Y--OLYM - FAIRHOLME CG ABAAS IMPROVEMENTS

Response deadline
Aug 18, 2026
Due in 1 day
Date posted
Aug 2, 2026

Description

The National Park Service (NPS) Olympic National Park (OLYM) in Clallam County, Washington, has a requirement to make ABAAS improvements and construct family restroom foundations at Fairholme Campground. 1. The work of this contract consists of constructing: a.) 12'x12' foundation, floor slab, retaining wall, and apron/sidewalks for Loop A comfort station. Stairs, ABAAS ramp, and handrails on the Loop A comfort station. b.) 12'x12' foundation, floor slab, and comfort station apron/sidewalks for the Loop B Comfort Station. c.) Make necessary rough in utility connections for family restroom foundations. d.) New or improved ABAAS trails connecting sites 3,4,16,45,69 including crosswalk for site 16. e.) ABAAS improvements to campsites 3,4,16,45,69. f.) Remove, Repair, and Reinstall signboards at comfort station Loop A and Loop B. 2. Option Items May include: a. Construct ABAAS crosswalk and trail connecting campsite 3 to Loop A comfort station trail. Asphalt pave parking areas for campsites 3 and 4. b. Construct ABAAS crosswalk and trail connecting campsite 69 to Loop B comfort station trail. Asphalt pave parking areas for campsites 45 and 69.

Classifications

Documents (19)

  • Amendment_2_0002.pdf
    .pdf336 KB
    Download
  • B08_Attachment_11_52_222-38_Response_Form_-_Copy.pdf
    .pdf138 KB
    Download
  • B08_Attachment_09_Past_Performance_Questionnaire_-_Copy.docx
    .docx47 KB
    Download
  • B08_Attachment_07_Project_Experience_Questionnaire_-_Copy_(2).docx
    .docx40 KB
    Download
  • B08_Attachment_08_Key_Personnel_Experience_-_Copy.docx
    .docx23 KB
    Download
  • B08_Attachment_02_Existing_Condition_Photos_-_Copy.pdf
    .pdf3.9 MB
    Download
  • B08_Attachment_06_Proposal_Submission_Package_Cover_Page_and_Table_of_Contents.pdf
    .pdf105 KB
    Download
  • B08_Attachment_10_52_209-13_Response_Form_-_Copy.pdf
    .pdf178 KB
    Download
  • B08_Attachment_14_Standard_Form_24__Bid_Bond_-_Copy_-_Copy.pdf
    .pdf720 KB
    Download
  • B08_Attachment_01_Specifications_SOW_Fairholme_CG_ABAAS_Improvements_-_Copy.pdf
    .pdf361 KB
    Download
  • B08_Attachment_04_Construction_Wage_Determination_SAM_-_Copy.pdf
    .pdf200 KB
    Download
  • Sol_140P8326R0006_Amd_0001.pdf
    .pdf202 KB
    Download
  • B09_Amendment_01_Attachment_1_Site_Visit_Discussion_Notes_140P8326R0006_0001.pdf
    .pdf137 KB
    Download
  • B08_Attachment_03_Fairholme_Campground_ABAAS_Improvements_and_Family_Restroom_Foundations_Drawings_-_Copy.pdf
    .pdf7.9 MB
    Download
  • B08_Attachment_12_General_References_-_Copy_(2).pdf
    .pdf104 KB
    Download
  • B08_Attachment_05_Price_Schedule_and_Forms_to_Submit_with_Proposal_-_Copy.pdf
    .pdf441 KB
    Download
  • Sol_140P8326R0006.pdf
    .pdf840 KB
    Download
  • Sol_140P8326R0006_Amd_0002.pdf
    .pdf202 KB
    Download
  • B08_Attachment_13_Subcontracting_Percentage_Worksheet_-_Copy_-_Copy.xlsx
    .xlsx89 KB
    Download

Contacts

Similar contracts

Explore more