SAM.gov89503226BWA000078
Open
Y--North Gunnison Substation 115kV Switch Install
- Response deadline
- Jul 6, 2026 Closed
- Date posted
- Jun 20, 2026
- Source
- Open notice
Description
Amendment (0003) to correct Bid Opening Date. North Gunnison 115-kV Switch Installation to add a 115kV Disconnect Switch to the bus work to provide flexible operation to feed the North Gunnison loads and allow WAPA to maintain all the electrical substation equipment. a. Provide demolition and site development. b. Remove and dispose of existing pedestals, rigid bus, insulators, and concrete foundations. c. Furnish and install 115kV disconnect switch, structural steel, foundations, and associated equipment.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
- jpratt@wapa.gov720-962-7166
Similar contracts
- P210 Electric Power Plant and Electrical Distribution System at Chabelley Airfield, DjiboutiDue Nov 16, 2026
- Y--COTP Series Capacitor Two-Phase Design BuildDue Nov 13, 2026
- USFK C4I Communication Tower and Facility Maintenance CY27Due Nov 18, 2026
- Power Construction and Services II (PCS II) MATOCDue Nov 3, 2026
- Request for Quotations (RFQ) - Trenching, Underground Conduit Installation and Associated Civil WorksWestern CapeDue Nov 3, 2026
- Industry Day - Sentinel Utility Infrastructure Improvements at MAFBMontanaDue Oct 19, 2026