SAM.gov140R4026B0002
Open
Y--NGWSP Turnout Buildings
- Response deadline
- Aug 12, 2026 Closed
- Date posted
- Jul 13, 2026
- Source
- Open notice
Description
The purpose of this amendment is to update the IFB 140R4026B0002 NGWSP Turnout Buildings Draft Document to include the SF-1442.
Classifications
Documents (8)
- _1_Attachment_00_00_01_NGWSP_TURNOUT_BLDGS_Specifications_20260707_DRAFT_4.pdf.pdf8.1 MBNot yet available
- IFB_140R4026B0002_NGWSP_Turnout_Buildings_Draft_5.pdf.pdf2.5 MBNot yet available
- _3_Attachment_00_00_02A_-_Geology_Drawings_04032026_DRAFT_4.pdf.pdf8.2 MBNot yet available
- _6_Attachment_WD_NM20260046_Building_-_San_Juan_County__NM_4.pdf.pdf60 KBNot yet available
- 01_140R4026B0002_Presol_Notice_4.pdf.pdf202 KBNot yet available
- IFB_140R4026B0002_NGWSP_Turnout_Buildings_Draft_13JULY26_4.pdf.pdf1.1 MBNot yet available
- _5_Attachment_WD_NM20260040_Heavy_-_San_Juan_County__NM_4.pdf.pdf59 KBNot yet available
- _2_Attachment_00_00_02_Drawings_Combined_34x22_20260707_DRAFT_4.pdf.pdf50.0 MBNot yet available
Contacts
Similar contracts
- 658-23-108 Correct Stormwater DrainageVirginiaDue Nov 10, 2026
- 4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, WyomingWyomingDue Nov 4, 2026
- Loleta Water System UpgradesPennsylvaniaDue Oct 26, 2026
- Kelly Pierson OSSWashingtonDue Oct 28, 2026
- Well Replacement at Lac Qui Parle Project shop siteDue Oct 22, 2026
- 9-Mile Pump StationDue Oct 20, 2026