SAM.gov140P5426R0020
Open
Y--Moat Boardwalk Replacement at Fofr
- Response deadline
- Sep 1, 2026 Closed
- Date posted
- Aug 10, 2026
- Source
- Open notice
Description
The purpose of Amendment 0002 is to update the Statement of Work (SOW) for Solicitation 140P5426R0020. The original SOW dated July 31, 2026, has been replaced with a revised version to correct, clarify, and/or update project requirements associated with the Fort Frederica Moat Boardwalk Replacement. The updated SOW is included as a new attachment to this solicitation and supersedes all previous versions. Offerors are responsible for reviewing the revised SOW in full and ensuring all proposal materials reflect the updated requirements. No other changes are made by this amendment. All other terms and conditions of the solicitation remain unchanged.
Classifications
Documents (7)
- DownloadA04_Statement_of_Work_-_FOFR_Boardwalk_Amended_SOW_(8-10-2026)_0002.pdf.pdf2.3 MB
- DownloadB03_Wage_Determination_(GA20260293).pdf.pdf194 KB
- DownloadSol_140P5426R0020.pdf.pdf540 KB
- DownloadSol_140P5426R0020_Amd_0001.pdf.pdf202 KB
- DownloadA04_Statement_of_Work_-_SOW_-_FOFR_Boardwalk.pdf.pdf1.6 MB
- DownloadSol_140P5426R0020_Amd_0002.pdf.pdf202 KB
- DownloadB11_Sol_140P5426R0020_-_Past_Performance_Questionnaire.pdf.pdf160 KB
Contacts
Similar contracts
- Y--NOAA/USCG Cutter STORIS Homeporting ProjectDue Oct 16, 2026
- Gulf Intracoastal Waterway High Island to Causeway with Channel to Port Bolivar Maintenance DredgingDue Oct 29, 2026
- Sandbridge Beach Erosion and Hurricane Protection Beach Renourishment ProjectDue Oct 2, 2026
- Sources Sought: The Dalles Dam Gate Repair Pit Fire Protection and Life Safety UpgradesDue Oct 15, 2026
- Chief Joseph Dam (CJD) Intake Concrete Stairs RepairWashingtonDue Oct 13, 2026
- Coastwide Beach and Dune Ecosystem RestorationDue Oct 30, 2026