SAM.gov140P8126B0007
Open
Y--Lake - Extend Ramp at Pearce Ferry
- Response deadline
- Jul 8, 2026 Closed
- Date posted
- Jun 22, 2026
- Source
- Open notice
Description
LAKE - EXTEND RAMP AT PEARCE FERRY
Classifications
Documents (8)
- DownloadB08_-_Atch_3_-_Wage_Determination_AZ20260058_1_2_26.pdf.pdf342 KB
- DownloadB08_-_Atch_5_-_Limitation_on_Subcontracting_Report_Template.xlsx.xlsx158 KB
- DownloadB08_-_Atch_2_-_Pearce_Ferry_Takeout_Ramp_Plans.pdf.pdf17.3 MB
- DownloadSol_140P8126B0007.pdf.pdf650 KB
- DownloadB08_-_Atch_4_-_Construction_Contraction_Administration.pdf.pdf160 KB
- DownloadB08_-_Atch_1_-_Pearce_Ferry_Takeout_Ramp_Specs.pdf.pdf1.3 MB
- DownloadB03_-_Wage_Determination_AZ20260058_5_18_26_0001.pdf.pdf281 KB
- DownloadSol_140P8126B0007_Amd_0001.pdf.pdf374 KB
Contacts
Similar contracts
- SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR CAPE MAY TO LOWER TOWNSHIP, NEW JERSEY, BRIGANTINE INLET TO GREAT EGG HARBOR INLET (ABSECON ISLAND), NEW JERSEY, AND BARNEGAT INLET TO LITTLE EGG, INLETNew JerseyDue Nov 2, 2026
- Corinth National Cemetery, 838Cm3036 – Gravesite Expansion and Cemetery ImprovementsMississippi
- SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR BETHANY BEACH AND SOUTH BETHANY BEACH, DE (CSRM - BEACHFILL), FENWICK ISLAND, DE (CSRM – BEACHFILL), REHOBOTH BEACH & DEWEY BEACH, DE (CSRM – BEACHFILL)DelawareDue Nov 2, 2026
- Mill Springs National Cemetery Gravesite ExpansionKentucky
- Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less Than 18-Inch Diameter), Fully Operated with Attendant Plant and Personnel, and with a Draft not to Exceed 9 Feet, for Construction and Maintenance Dredging within the Vicksburg DistrictMississippiDue Oct 23, 2026
- Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund SiteDue Nov 20, 2026