SAM.gov140P2026R0011
Open
Y--GLCA Hite
- Response deadline
- Oct 30, 2026 Due in 58 days
- Date posted
- Sep 2, 2026
- Source
- Open notice
Description
GLCA 318878 Hite Small Boat Launch DB This procurement is being done as a Total Small Business Set Aside. This procurement is being done as a 2-phase design-build under FAR 36.3. Phase 2 began on September 2nd, 2026. Email any questions directly to anthony_jasper@ios.doi.gov.
Classifications
Documents (17)
- Sol_140P2026R0011_Amd_0002.pdf.pdf202 KBNot yet available
- B08_Attachment_08_GLCA_Hite_FWSOF_DRAFT.pdf.pdf28.0 MBNot yet available
- B08_Attachment_07_GLCA_Hite_ARDR.pdf.pdf13.1 MBNot yet available
- B08_Attachment_03_GLCA_318878_6914_Predesign_Material-GeologicMemo.pdf.pdf10.7 MBNot yet available
- B08_Attachment_12_WD_UT20260022_HITE.pdf.pdf237 KBNot yet available
- B08_Attachment_10_GLCA_IPM_Plan_Final_Sep2018.pdf.pdf885 KBNot yet available
- GLCA_Hite_District_Q_A_0001.pdf.pdf107 KBNot yet available
- B08_Attachment_04_GLCA_318878_6914_Predesign_Material-Hydraulic_Tech_Memo.pdf.pdf6.2 MBNot yet available
- B08_Attachment_02_GLCA_318878_6914_PLANS.pdf.pdf21.0 MBNot yet available
- B08_Attachment_09_GLCA_Hite-BasisOfDesign.pdf.pdf253 KBNot yet available
- B08_Attachment_05_GLCA_318878_6914_Predesign_Material-HydroanalysisModelingReport.pdf.pdf5.6 MBNot yet available
- B08_Attachment_01_GLCA_318878_6914_DESIGN_BUILD_RFP_260602.docx.docx805 KBNot yet available
- B08_Attachment_06_Final_GLCA_Project_Program_20220930.pdf.pdf35.1 MBNot yet available
- Sol_140P2026R0011.pdf.pdf282 KBNot yet available
- B08_Attachment_11_Proposal_Submission_Package_HITE.docx.docx78 KBNot yet available
- Sol_140P2026R0011_Amd_0001.pdf.pdf202 KBNot yet available
- B08_140P2026R0011_HITE.pdf.pdf908 KBNot yet available
Contacts
- tony_jasper@nps.gov3039692789
Similar contracts
- Y--GLCA 318882 Bullfrog Ramp DB
- MACC - TOPR Amendment Repair Lackland Youth Center PlaygroundDue Sep 17, 2026
- Finderne Farms Wetland Mitigation Site, Bridgewater, NjDue Sep 9, 2026
- Sc-Harris Nk Nwr Floating Dock ReplacementDue Sep 7, 2026
- KB Dock Piers Ladder ReplacementWashingtonDue Sep 19, 2026
- ATON Repair & Replace Work in the San Francisco AreaCaliforniaDue Sep 15, 2026