SAM.gov140P2026R0093
Open
Y--Cuva 224822 Stabilize Riverbank Mm20
- Response deadline
- Jul 13, 2026 Closed
- Date posted
- Jun 25, 2026
- Source
- Open notice
Description
STABILIZE RIVERBANK ALONG TOWPATH TRAIL NEAR MM 20 South
Classifications
Documents (1)
- DownloadB01_Synopsis_CUVA_224822_1.pdf.pdf224 KB
Contacts
- joseph_halter@nps.gov5309338687
Similar contracts
- Design-Bid-Build, Dredging at JEBLC Fuel Pier and Anzio Beach Sandbar, and JEBFS Utah Beach Sandbar, Joint Expeditionary Base Little Creek - Fort Story, Virginia Beach, VADue Sep 1, 2026
- Fy26 Houston Ship Channel, Texas Bayport Flare Hopper DredgingDue Oct 2, 2026
- Chickasaw County, Mississippi, Mississippi Delta Headwaters Project, Bank Stabilization 23-01
- NAICS 237990 PSC Y1PZ--CONS: 909CM3030 Fort Custer NC - Cemetery Expansion and Site ImprovementsMichiganDue Sep 17, 2026
- Sand Trail Phase IIAlaskaDue Sep 10, 2026
- Gulf Intracoastal Waterway, Texas High Island to Causeway and Channel to Port Bolivar Pipeline Maintenance DredgingTexasDue Sep 15, 2026