Civic AI
Civic AI
Procurement intelligence
SAM.gov1240LT26Q0154
Open

Big Piney Office Interior Sewer Line Replacement

Response deadline
Sep 14, 2026
Due in 30 days
Date posted
Aug 14, 2026

Description

This project consists of replacement of the sewer line and related repair work on the Big 1.2 Piney Ranger Station on the Bridger-Teton National Forest (NF). The facility is operated by the Bridger-Teton NF on the Big Piney Ranger District in Big Piney, Wyoming. Work will include demolition of finished flooring as needed, demolition of concrete slab along 81’ of sewer line, disconnection of 17 plumbing fixtures, replacement of sewer line, patching of concrete slab and replacement of aggregate, reconnection of 17 plumbing fixtures, and replacement of finished flooring. Work includes the removal and proper disposal of all demolished materials. The contractor shall provide all required materials. Quotes should describe the method that will be used to replace the sewer line, and what areas will be effected by related demolition work.

Classifications

Documents (7)

  • C04f Specs_BigPineySewer.Repair_2026.07.30.pdf
    .pdf928 KBNot yet available
  • C04e Past Performance Data Sheet.docx
    .docx14 KBNot yet available
  • C04b Drawings_Big Piney Sewer_2026.07.30.pdf
    .pdf5.1 MBNot yet available
  • C04 SF1442 1240LT26Q0154 - Final.pdf
    .pdf520 KBNot yet available
  • C04c - WD WY20260041 dtd 6-18-2026.pdf
    .pdf2.1 MBNot yet available
  • C04d Experience Questionnaire_3 pages- Word Doc.docx
    .docx40 KBNot yet available
  • C04a Schedule of Items.pdf
    .pdf184 KBNot yet available

Contacts

Similar contracts

Explore more