Shell Falls Primary Power
- Response deadline
- May 4, 2026 Closed
- Date posted
- Apr 27, 2026
- Source
- Open notice
Description
Shell Falls Primary Power The project requires the contractor to be responsible for supplying all labor, materials, equipment, miscellaneous items, freight, delivery, and all necessary valid licenses and permits required to complete the improvements at the Bighorn National Forest, Shell Falls Wayside addressing the site�s primary power supply. This project aims to address on-site generated power, wastewater system revisions and water system reinstallation IAW the Statement of Work, drawings and applicable specifications. NAICS:237990. NAICS Small Business Size Standard: $45M Magnitude of Construction is between $1,000,000 and $5,000,000 This is solicited 100% Small Business Organized Site Visit Name: Christopher Wolffing Address: Approximately 26 miles east of Greybull, and 69 miles west of Sheridan, along U.S. Highway 14 in Bighorn County, Wyoming. The site legal description is the East � Section 7, T53N, R89W. Date and Time: April 1, 2026, 10:00 AM Mountain Telephone: 307-674-2647 Email: Christopher.wolffing@usda.gov Questions shall be submitted via email to erick.plamann@usda.gov and are due no later than April 8, 2026, at 12:00 PM Central Time. No other means will be accepted
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- Small Business Multiple Award Task Order Contract (MATOC) for the Missouri River Bank Stabilization and Navigation Project (BSNP)
- FWS - Pixley NWR Water Recirculation Design-BuildDue Nov 30, 2026
- Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less Than 24-Inch Diameter) Fully Operated with Attendant Plant and Personnel, and with a Draft not to Exceed 9 Feet, for Construction and Maintenance Dredging - JBJ WaterwayMississippiDue Nov 16, 2026
- Lease of One Cutterhead, Hydraulic Pipeline Dredge (Not Less Than 18-Inch Diameter) Fully Operated with Attendant Plant and Personnel, and with a Draft not to Exceed 9 Feet, for Construction and Maintenance Dredging - MS River HarborsMississippiDue Nov 16, 2026
- St. Lucie South Jetty Repair Industry DayFloridaDue Dec 7, 2026
- Repair Aids to Navigation (ATON) - Southern Area of USCG District NortheastConnecticutDue Dec 8, 2026