NRCS-WV Ohio County EWP 5090-001 & 003 Streambank Stabilization Dixon and McGraw's Run
- Response deadline
- Jun 18, 2026 Closed
- Date posted
- Jun 5, 2026
- Source
- Open notice
Description
Please see Attachment 1 Specifications documents for full details of services requried. USDA-NRCS West Virginia - Ohio County EWP 5090-001 & 003 Streambank Stabilization Dixon and McGraw's Run A site visit will be held on date May 28th, 2026 at 10:00am ET on that day. Attendees will meet at: Valley Grove Community Center 8566 National Road Valley Grove, WV 26060 The project consists of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish and the shaping of the channel. Installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities. Preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified. The work consists of the mobilization and demobilization of the contractor�s forces and equipment necessary for performing the work required under the contract. Establishing traffic control and maintaining safe, convenient use of public roads and right of way. Removal of surface water and ground water as necessary to perform the construction required by the contract in accordance with the specifications. It must include: (1) constructing, installing, building, and maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing, installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3) removing all such temporary works and equipment after their intended function is no longer required. Excavation required by the drawings and specifications, as well as the disposal of the excavated materials. Construction of earth embankments, other earthfills, and earth backfills required by the drawings and specifications. *See Specifications document attached to posting for full details of required work.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- Webbers Falls Excitation System ReplacementsDue Oct 23, 2026
- GIWW Freeport to Matagorda Maintenance DredgingDue Oct 19, 2026
- 2027-2029 Maintenance Dredging, Anchorage Harbor, AlaskaAlaska
- Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020Due Nov 6, 2026
- GAOA Kents Lk. CG Reconstruction, Fishlake NF, UtahUtahDue Oct 28, 2026
- Fall River Lake and Dam Damsite Park Lagoon RepairDue Oct 20, 2026