SAM.gov70Z085_Z-DRIVE
Open
WLM 175� Cutter 1350 Azimuth Thruster Overhaul and Storage
- Response deadline
- Jul 29, 2026 Closed
- Date posted
- Jul 15, 2026
- Source
- Open notice
Description
The purpose of this requirement is to procure contractor that will provide all labor, equipment and materials required to receipt for, store, disassemble, inspect, overhaul, reassemble, test, preserve, package, pack, mark, and provide all documentation cited herein for each Ulstein Aqua master Model 1350H Z-Drive assembly provided by the U.S. Coast Guard. Each Z-Drive overhaul shall be performed in accordance with applicable Original Equipment Manufacturer (OEM) technical manuals, drawings, specifications and standard practices.
Classifications
Documents (2)
- REVISED WLM 175 Cutter 1350 Azimuth Thruster Overhaul SSN.pdf.pdf143 KBNot yet available
- WLM 175 Cutter 1350 Azimuth Thruster Overhaul SSN.pdf.pdf118 KBNot yet available
Contacts
Similar contracts
- Pump, Cooling System, EnDue Sep 15, 2026
- Pipe, ExhaustDue Sep 15, 2026
- Engine Start CartriDue Sep 11, 2026
- Nrp, Motor, BrushlessDue Sep 11, 2026
- Parts Kit, Diesel EnginDue Sep 15, 2026
- Fuel Pump, Support