Basketball court reconstruction
- Response deadline
- Aug 24, 2026 Due in 8 days
- Date posted
- Jul 31, 2026
- Source
- Open notice
Description
This solicitation is for reconstruction of the basketball half-court at the U.S. Tri-Mission Marine House in Vienna, Austria. The work includes but is not limited to the following tasks – all as specified in the attached Statement of Work: Site Installation Demolition Demolition, removal, and disposal of the existing half-court basketball court (asphalt layer 7 x 8 m) and the basketball basket with posts. Excavation, oil removal and disposal of the foundation pit for new basketball half- court dimension (13mx14m = 182m²), 0.3m depth Removal of the existing outdoor lighting and reinstallation in a new location Construction of a new sports court, half-court basketball court (13 m x 14 m = 182 m²) Preparation and installation of the subbase and base course, including drainage Installation of the surface layer (EPDM rubber surfacing or equivalent) Installation of point foundations for 1 basketball hoop and 2 existing light poles Installation of 1 height-adjustable basketball hoop and 2 existing light poles, including wiring/rewiring Laying of concrete lawn edging stones Painting lines Final cleaning
Classifications
Documents (5)
Contacts
Similar contracts
- FY26 MOTSU BermsDue Aug 24, 2026
- TIMPAS PICNIC AREA SITE IMPROVEMENT PROJECTColoradoDue Aug 25, 2026
- Q4 FY26 Baltimore Harbor and Channels Maintenance Dredging, Maryland Channels, Chesapeake Bay, MDDue Sep 1, 2026
- RICHMOND INNER HARBOR FY26 MAINTENANCE DREDGING PROJECT Due Aug 28, 2026
- Calcasieu River and Pass, LA, Dredged Material Management Plan (DMMP), CDF-12A Degrading, Calcasieu Parish, LALouisianaDue Aug 21, 2026
- Thomas J. O Brien (TJO) Embankment RepairDue Sep 14, 2026