SAM.gov36C25226B0017
Open
Z1DA--676-22-108 Connect Generator to EP B406
- Response deadline
- Aug 4, 2026 Due in 10 days
- Date posted
- Jul 24, 2026
- Source
- Open notice
Description
Provide Construction Services for Project 676-22-108 Connect B406 AHU to Emergency Power. Project Scope: 1. The contractor shall provide for and furnish all labor, materials, equipment, qualified supervision, and other items designated in this contract in accordance with federal, state, and local authorities, project specifications, and drawings necessary to complete the construction of this project at the VA Medical Center, Tomah, Wisconsin. 2. All work shall be completed within 480 calendar days after receiving the notice to Proceed (NTP). 3. See plans and specifications for further information
Classifications
Documents (16)
- S06 - Arc Flash 19 Building 406-2.pdf.pdf13 KBNot yet available
- 36C25226B0017_1.pdf.pdf509 KBNot yet available
- S06 - Wage Det WI20260011 dtd 05182026.pdf.pdf4.4 MBNot yet available
- 36C25226B0017 0002.pdf.pdf94 KBNot yet available
- S06 - FAR 52.222-90.pdf.pdf106 KBNot yet available
- 36C25226B0017 0001.pdf.pdf94 KBNot yet available
- S06 - Drawing Set 676-22-108 Updated.pdf.pdf20.6 MBNot yet available
- S02 - Wage Det WI20260011 01022026.pdf.pdf4.6 MBNot yet available
- S06 - Arc Flash 18 Building 406-1.pdf.pdf11 KBNot yet available
- S02 - Drawings 676-22-108.pdf.pdf18.7 MBNot yet available
- S06 676-22-108 Connect B406 AHU to Emerg Power PreBid RFIs 20260526.pdf.pdf81 KBNot yet available
- 36C25226B0017 0003.pdf.pdf166 KBNot yet available
- S02 - Specifications 676-22-108.pdf.pdf4.0 MBNot yet available
- S04 - Prebid Walk Sign In 676-22-108.pdf.pdf185 KBNot yet available
- S06 - Arc Flash 20 Building 406-3.pdf.pdf11 KBNot yet available
- S06 - Specs 676-22-108 Updated.pdf.pdf4.5 MBNot yet available
Contacts
- Contract Specialist
Similar contracts
- HELENA NATIONAL FOREST - Solar System Install on Existing WellMTDue Aug 6, 2026
- HELENA NATIONAL FOREST - Solar System Install on Existing WellMTDue Aug 6, 2026
- Z1DA--Project No. 552-26-202 - Replace Overhead Paging SystemDue Aug 5, 2026
- Z1DA--Project No. 552-26-202 - Replace Overhead Paging SystemDue Aug 5, 2026
- Wake Island Air Field Fiber Installation79Due Jul 30, 2026
- Z1DA--Project No. 552-26-202 - Replace Overhead Paging SystemDue Aug 5, 2026