Civic AI
Civic AI
Procurement intelligence
wi_vendornet2026-23
Open

Stationary Industrial Vacuum System

Response deadline
Sep 8, 2026
Due in 7 days
Date posted
Aug 17, 2026

Description

The intent of this solicitation is to secure a complete, installed solution that provides reliable capture, transport, and collection of debris generated by transit bus operations. The system should also be engineered with flexibility to support the possibility of future expansion. The Vacuum System shall serve three primary and integrated functions: (1) vacuum generation through vacuum pumps, (2) material conveyance through a fixed piping system, and (3) separation and containment through filtration. These functions must operate together as a single, efficient extraction system designed for continuous or intermittent duty.

Classifications

Documents (3)

  • 2026-23 Addendum (1).pdf
    application/octet-stream161 KB
    Download
  • 2026-23 RFP.pdf
    application/octet-stream831 KB
    Download
  • Attachment 1 - FTA Clauses Certificates.pdf
    application/octet-stream451 KB
    Download

Contacts

Explore more