Whitney Lake Road Repairs
- Response deadline
- Sep 14, 2026 Closed
- Date posted
- Aug 12, 2026
- Source
- Open notice
Description
PROJECT DESCRIPTION: Contractor shall perform the following work defined below in McCown Valley Park to include Asphalt full Depth Repair, Asphalt Crack and Chip Sealing, Culvert and Ditch Repairs, Culvert Replacement, Lofers Bend West Park Concrete Placement, Concrete Ribbon Curb, Concrete Slab Placement, and McCown Valley Park Concrete Ribbon Curb expansion. Product Service Code: Z2LB - REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS 1. NAICS: 237310 Highway, Street, and Bridge Construction / SIZE STANDARD - $45M AND IS A SMALL BUSINESS SET ASIDE 2. CONTRACT TYPE: FIRM FIXED PRICE. 3. PERFORMANCE PERIOD IS 165 CALENDAR DAYS INCLUSIVE OF ALL CLINS 4. BID BOND IS 20% OR $3M, WHICHEVER IS LESS 5. BONDING CAPACITY MUST BE DEMONSTRATED (MINIMUM OF $1M, AND $2.5M ANNUAL AGGREGATE).
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- Notice of Intent (NOI) to Sole Source for SAFB Taxiway Repairs at SAFB, ILIllinoisDue Oct 14, 2026
- CO NP BLCA 10(1) South Rim DriveColoradoDue Oct 8, 2026
- Opportunity Available to NM FERM BPA Zone 1 Contractors ONLY with the USDA Forest ServiceNew MexicoDue Oct 22, 2026
- Bonneville Lock and Dam - Navigation Lock 1 Bridge ReplacementOregonDue Oct 8, 2026
- Sidewalk Replacement Throughout Lyons CampusDue Oct 9, 2026
- Airfield Civil Works IDIQDue Oct 5, 2026