EWP Streambank Stabilization McDowell County, WV.
- Response deadline
- Aug 14, 2026 Due in 1 day
- Date posted
- Aug 13, 2026
- Source
- Open notice
Description
Amendment: Quantity on Bid Schedule for Line Item 9: Gabions, has been changed to 198.0 CY due to an error in calculation. Updated maps and drawings have been attached. Please adjust your bids accordingly. ****************************************************************************************** AMENDMENT: Removal of Site 3 (War Creek) from solicitation. Updated Construction Specs & Drawings uploaded. Bids will now be due August 14, 2026 by 2:00pm ET. **************************************************************************************** Update - Bids are now due 8-11-2026 by 2:00pm ET. ****************************************************************************************** UPDATED SITE VISIT INFORMATION.............. The Site Visit has been changed to Thursday, July 30, 2026 @10:30am ET. *************************************************************************************************** The USDA-NRCS, under the Emergency Watershed Protection Program, will complete work to remove materials in the stream that are compromising the capacity of the streams and stabilize areas adversely impacting structures. Additional details provided in attachments. CONTRACTOR RESPONSIBILITIES: 1. Provide all supervision, labor, tools, equipment, transportation, and material necessary to perform the work. 2. Follow industry standards, all federal and state, and local construction, safety and labor laws. 3. Contractor is responsible for their equipment. The Government is not liable for damages or losses of equipment due to theft or vandalism. 4. Remove all debris and excess materials from the site and dispose of them properly. SITE VISIT. Interested vendors can review the work site by attending the Site Visit on July 21, 2026, at 10:30am ET. Site Visit Location: Paved parking lot near the Rt. 52 bridge that crosses Spice Creek. GPS Coordinates: 37.4451661, -81.702033 Review of the work site is not mandatory, but highly recommended. Site Visit POC: Joe Wickline at joseph.wickline@usda.gov, 681-220-5765.
Classifications
Documents (9)
- C04 12FPC326B0014 Amendment 1.pdf.pdf1.2 MBNot yet available
- C04 12FPC326B0014 EWP_2025_McDowellCo_CoalHeritageRd_SpiceCk-Dwgs_20260813_v3.pdf.pdf8.3 MBNot yet available
- C04 12FPC326B0014 003 EWP_2025_McDowellCo_CoalHeritageRd_SpiceCk-Dwgs_20260803_v2.pdf.pdf8.3 MBNot yet available
- C04 12FPC326B0014 003 EWP_2025_McDowellCo_CoalHeritageRd_SPECS_Updated_20260804ad.pdf.pdf1.3 MBNot yet available
- C05 12FPC326B0014 Amendment 3.pdf.pdf1.3 MBNot yet available
- C05 12FPC326B0014 Amendment 2.pdf.pdf1.2 MBNot yet available
- C05 12FPC326B0014 Amendment 4.pdf.pdf1.4 MBNot yet available
- C04 12FPC326B0014 Wage Determination.pdf.pdf62 KBNot yet available
- 12FPC326B0014.pdf.pdf1.2 MBNot yet available
Contacts
- bobby.copenny@usda.gov8175093503
Similar contracts
- Lowell Creek Tunnel Repairs Industry DayAlaskaDue Aug 24, 2026
- FY27 Maintenance Dredging Yokohama North DockDue Sep 25, 2026
- CONANT BANK STABILIZATIONDue Sep 14, 2026
- USACE SPK Construction - Natomas PP5, Sacramento, CADue Sep 1, 2026
- FY27 Maintenance Dredging Yokohama North DockDue Sep 25, 2026
- CMC Greenspace IFBDue Sep 8, 2026