167th AW Base Pavement Repairs
- Response deadline
- Sep 11, 2026 Due in 8 days
- Date posted
- Sep 3, 2026
- Source
- Open notice
Description
***AMENDMENT 0002*** THE PURPOSE OF THIS AMENDMENT IS TO ADD THE ATTENDANCE SHEET AND POWERPOINT FROM THE SITE VISIT THAT TOOK PLACE AT THE 167TH AW ON 2 SEPTEMBER 2026 TO THE LIST OF ATTACHMENTS. ***AMENDMENT 0001*** THE PURPOSE OF THIS AMENDMENT IS TO ADD ATTACHMENT 4.1 TO THE STATEMENT OF WORK (SOW). PLEASE REVIEW ALL DRAWINGS AND MAPS PRIOR TO SITE VISIT AND Q&A PERIOD. IN ADDITION, PLEASE SUBMIT YOUR BACKGROUND FORMS NLT 26 AUGUST 2026, IF YOU PLAN TO ATTEND THE SITE VISIT ON 2 SEPTEMBER 2026. ______________________________________________________________________________________________________ ***ORIGINAL SOLICITATION*** This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. W50S8V-26-Q-0025 – This solicitation is issued as a request for quotation (RFQ) This solicitation document and incorporated provisions and clauses are those in effect through RFO and Federal Acquisition Circular FAC 2026-01 dated 03-13-2026. This requirement is designated with a Small Business set-aside of Total Small Business and associated with NAICS code: 237310 and a small business size standard of $45M. The 167th Airlift Wing, Martinsburg, WV is requesting a quote for base pavement repairs IAW the attached Statement of Work (SOW). This requirement is being requested and evaluated based on Price Alone with no discussions being held. Please provide a quote in accordance with your terms & conditions. PROJECT TITLE: Base Pavement Repairs PROJECT LOCATION: 222 SABRE JET BLVD, MARTINSBURG, WV Multiple Locations on base as identified in the Statement of Work (SOW) THIS PROJECT IS BEING SOLICITED AS A TOTAL SMALL BUSINESS SET-ASIDE IN ACCORDANCE WITH FAR 19.5. PROJECT NAICS: 237310 WITH A CORRESPONDING SIZE STANDARD OF $45.0M. DISCLOSURE OF MAGNITUDE: IAW FAR 36.204(e) THIS PROJECT IS EXPECTED TO BE BETWEEN $500,000.00 AND $1,000,000. DAVIS BACON WAGE RATES ARE APPLICABLE TO THIS PROJECT. FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS ACQUISITION. THE GOVERNMENT ANTICIPATES FUNDS WILL BECOME AVAILABLE PRIOR TO AWARD AS THIS ACTION HAS BEEN IDENTIFIED ON THE NATIONAL GUARD PRIORITY LIST. There will be a site visit scheduled for 02 September 2026 at 0900 at the 167th AW in Martinsburg, WV 25405. Please utilize the attached base pass documents to obtain a base pass 5 days prior to the site visit. Documentation can be sent to philip.henderson.5@us.af.mil AND christopher.broschart@us.af.mil.
Classifications
Documents (8)
- Attendance Sheet - Base Pavement Repairs.pdf.pdf163 KBNot yet available
- Site Visit PP - Base Pavement Repairs.pptx.pptx220 KBNot yet available
- Combined Synopsis_Solicitation -Base Pavement Repair Combined Updated.pdf.pdf302 KBNot yet available
- Davis Bacon WDWV20260099.pdf.pdf1.7 MBNot yet available
- BACKGROUND FORM FEB 2026.pdf.pdf184 KBNot yet available
- INSTRUCTIONS FOR THE BACK GROUND FORM PLEASE READ AND FOLLOW DIRECTIONS DEC 2025.pdf.pdf81 KBNot yet available
- Attachment 4.1 - DRAWINGS and MAPS.pptx.pptx10.3 MBNot yet available
- 260332 - Repair Base Pavements - SOW Signed.pdf.pdf785 KBNot yet available
Contacts
Similar contracts
- Z--Road/Parking Lot Striping, Lava Beds NMCADue Sep 9, 2026
- Tailwater and Control Tower paving, sealing, and striping for Nolin River LakeDue Sep 10, 2026
- Permanent Pavement MarkingDue Sep 14, 2026
- Bonneville Lock and Dam - Navigation Lock 1 Bridge ReplacementOregonDue Oct 8, 2026
- New Fort Bliss Paving IDIQ ContractTexasDue Sep 24, 2026
- Improve Hamat RunwayDue Oct 5, 2026