WATER SYSTEM FAULTY PROGRAMMABLE LOGIC CONTROLER REPLACEMENT
- Response deadline
- Sep 5, 2026 Due in 24 days
- Date posted
- Jul 31, 2026
- Source
- Open notice
Description
The U.S. Embassy in Bujumbura, Burundi, has a requirement to replace the faulty Programmable Logic Controller (PLC) of its Domestic Water Treatment Plant (DWTP) and integrate BACnet communication to enable connectivity with the Building Automation System (BAS). This upgrade will allow the Facilities Team to monitor water levels, production, and distribution to Embassy buildings in real time, in accordance with the attached Statement of Work (SOW). The existing PLC, an Allen-Bradley MicroLogix 1200, has experienced a fatal internal failure and must be replaced. All interested vendors are requested to submit their best and final quotation no later than July 18, 2026, at 10:00 a.m. Bujumbura time, for the following requirement: Domestic Water Treatment Plant (DWTP) System – PLC Supply, Installation, Programming, Integration, Testing, and Commissioning Services Vendors must provide a detailed and itemized price quotation. Lump-sum or incomplete pricing that does not clearly identify individual components and services may not be considered during the evaluation process. Each line item should include sufficient detail for technical and price analysis. The quotation should, at a minimum, include the following categories: 1. Staff Services Technical personnel Labor costs Travel expenses Accommodation and per diem (if applicable) Engineering and programming services Testing and commissioning services 2. Materials and Equipment PLC hardware and accessories BACnet communication modules and interfaces Software licenses (if applicable) Control panels, cables, connectors, and related components Any additional equipment required for a complete installation 3. Installation and Commissioning Removal of existing PLC Installation of new PLC and associated equipment Programming and system configuration BAS integration and BACnet communication setup Functional testing System commissioning Operator training and documentation Please ensure that all proposed equipment and services comply with the requirements specified in the attached Statement of Work. Amendment 1: See all attached.The new offer due date is September 5, 2026
Classifications
Documents (3)
Contacts
Similar contracts
- FAC FWP502 RFQ Completion, Integration and Commissioning of Vehicle Gate Security System at Chief of Mission Residences(CMR)Due Sep 5, 2026
- SOLAR PV PREVENTIVE MAINTENANCE SERVICESDue Aug 18, 2026
- CONSULAR AUDIO - VISUAL PREVENTIVE MAINTENANCE SERVICESDue Aug 18, 2026
- RIO Elevator preventive maintenance FY26BR-RJDue Jul 31, 2026
- M R-FAC Compound Generator PMSC contract 7901 - XJZMSRVCDJ-DJDue Jul 31, 2026
- Rangoon CMR Ceiling ReplacementMM-06Due Aug 6, 2026