WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8
- Response deadline
- —
- Date posted
- Sep 24, 2026
- Source
- Open notice
Description
Project name and number: WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8 This work consists of: Bank stabilization, riprap, engineered log jam with dolosse. Project Location: This project is located approximately 26 Miles SE of Forks, WA. Project Length: 0.12 Miles Estimated Price Range: Between $2,000,000 and $5,000,000 Tentative Solicitation Date: Fall 2026/ Winter 2027 Tentative Fixed Completion Date: Fall 2027 PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the INVITATION FOR BIDS (specifications and plans) will be posted at this link.
Classifications
Documents (3)
- wa-ep-olym2022-1-3_plans.pdf.pdf32.1 MBNot yet available
- Project Description_WA ERFO NPS OLYM 2022-1(3).pdf.pdf260 KBNot yet available
- wa-ep-olym2022-1--3_Prelim Letter.pdf.pdf160 KBNot yet available
Contacts
- wfl.contracts@dot.gov3606197520
Similar contracts
- Northeast Region Pavement and Bridge Preservation Construction - NP NER PMS BMS FY25(2)PennsylvaniaDue Dec 8, 2026
- SAS4408 Pedestrian Bridge ReplacementNorth CarolinaDue Nov 30, 2026
- CO BR UCPO Blue Mesa Road(1) Blue Mesa RoadColorado
- Acadia National ParkMaineDue Nov 17, 2026
- Dugway Proving Ground (DPG) Horizontal Facility Construction Road MaintenanceUtahDue Nov 18, 2026
- VI DPC A34(1) – Veterans Drive Contract 2 Improvements to RTE 30Virgin Islands, U.S.Due Jan 13, 2027