Split-Unit HVAC Replacement
- Response deadline
- Sep 24, 2026 Due in 7 days
- Date posted
- Sep 17, 2026
- Source
- Open notice
Description
All questions must be submitted in writing to the Contracting Officer by September 21, 2026 at 5:00p.m (EDT). A site visit will be conducted on September 18, 2026 at 1:30p.m (PDT). Personnel attending the site visit will meet at 9190 Cramer Ave, Joint Base Lewis-McChord, WA 98433. An escort is required for the site visit and will be provided by the Government. Point of contact for the site visit is CPT Megan Colpo (925) 917-0784. Contact the POC for assistance with directions and notify her of arrival due to the escort requirement. Personnel that do not have access to JBLM must go through the Visitor Center at Liberty Gate to receive a visitor's pass. Requirements for the visitor's pass includes REAL ID (passport and social security card for those that do not have a REAL ID), valid driver's license, and vehicle insurance information. Desription of Work This non-personal services contract requires the contractor to provide all necessary personnel, equipment, materials, and labor to remove and replace 16 nonfunctional ductless heat pump A/C systems with new, cooling-only split A/C systems. The work will take place across multiple First Special Forces Group (Airborne) headquarters and augmentation facilities (Buildings 9160/9162, 9190, 9934, and 9983) to establish optimal operational temperatures for critical computer and communication systems. The contractor operates independently under its own supervision, remaining fully accountable to the Government for meeting all performance standards. The scope of work includes disconnecting and reconnecting power and refrigerant lines, removing and disposing of the nonworking units, and installing and testing the new cooling-only units. Additionally, the contractor must add external condensation pumps, purge and test existing drain lines, and replace them as needed. The designated period of performance for this mission-critical climate control upgrade is scheduled from September 28, 2026, to November 12, 2026.
Classifications
Documents (8)
- PWS_1SFG_MICC_Split Units_Updated final.docx.docx40 KBNot yet available
- HVAC Floor Plan_Split Units.pptx.pptx633 KBNot yet available
- HVAC Replacement RFIs_all.docx.docx26 KBNot yet available
- Solicitation - H9242126QE047 - CO Signed.pdf.pdf2.1 MBNot yet available
- FAR_52.212-1_Addendum_-_Instructions_to_Offerors_(1SFG_HVAC_Replacement).docx.docx33 KBNot yet available
- Pierce County Wage Determination.txt.txt43 KBNot yet available
- Solicitation Amendment H9242126QE0470001 SF 30.pdf.pdf1.3 MBNot yet available
- AC INFO.xlsx.xlsx41 KBNot yet available
Contacts
Similar contracts
- Wastewater System Improvements Stuttgart National Aquaculture CenterArkansasDue Sep 22, 2026
- Building 450 Fire Suppression System InstallationIndianaDue Oct 8, 2026
- Fsc Wastewater Treatment Plant (Wwtp) / Dahlgren, VAVirginiaDue Sep 23, 2026
- B10 ChillerKansasDue Sep 22, 2026
- Bldg 3820 Chiller Diagnostic and VFD ServicesTexasDue Sep 22, 2026
- 554-26-106 Replace DW ValvesDue Sep 30, 2026