Selkirk to Surf Road Maintenance
- Response deadline
- Sep 14, 2026 Due in 18 days
- Date posted
- Aug 27, 2026
- Source
- Open notice
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 1240LT26Q0115 is issued as a Request for Quotation (RFQ) for Selkirks to Surf project area; with the overall intention to make improvements to trails, bridges, campgrounds, and scenic viewpoints across the North Cascades Recreation Scenic Corridor. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237310 The small business size standard is $45M This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency. The project is located within the Methow Valley Ranger District of the Okanogan-Wenatchee National Forest, Okanogan County, Washington. To access the project from Winthrop, WA head west on SR-20 for 13.2 miles, then turn right onto Lost River Road towards Mazama, WA. In 1500 ft, at the stop sign and junction with Goat Creek Road, stay left (northwest) on Lost River Road and proceed 6.8 miles to Beginning of Project (BOP) at MP 0.00 of FSR 5400 Harts Pass Road. BOP of FSR 5400600 Slate Peak Road is at end termini of FSR 5400. Questions shall be submitted via email to christopher.malley@usda.gov and are due no later than September 7, 2026, at 1:00 PM Pacific Time. All proposals shall be emailed to the Contract Specialist christopher.malley@usda.gov and pps.proposals@usda.gov no later than September 14, 2026, 1:00 PM Pacific Time.
Classifications
Documents (9)
- Attachment 7 - Fire Plan.pdf.pdf97 KBNot yet available
- 1240LT26Q0115 - Selkirk to Surf Road Maintenance.pdf.pdf772 KBNot yet available
- Attachment 1 - Schedule of Items.xlsx.xlsx13 KBNot yet available
- Attachment 2 - Statement of Work.docx.docx20 KBNot yet available
- Attachment 3 - Plans.pdf.pdf24.6 MBNot yet available
- Attachment 5 - Fire Clauses.pdf.pdf179 KBNot yet available
- Attachment 4 - FSSS - Specifications.pdf.pdf674 KBNot yet available
- Attachment 8 - Wage Determination.pdf.pdf22.5 MBNot yet available
- Attachment 6 - Camping Permit.pdf.pdf95 KBNot yet available
Contacts
Similar contracts
- GAOA Council Bluff Beach Access BridgesMissouriDue Sep 23, 2026
- Caesar Creek Lake Tailwater Road Crack Fill, Seal, and StripeOhioDue Sep 11, 2026
- GMF Hapgood Pond Dam Spillway Bridge SupportVermontDue Sep 3, 2026
- QMI ARSR Guardrail ReplacementWashingtonDue Aug 31, 2026
- Z--Road Striping, Whiskeytown National Recreation AreDue Sep 5, 2026
- Repair Quarters 1 - Driveways and SidewalksIllinoisDue Sep 17, 2026