Kalispel Tribe Dike Repair- Pend Oreille County, Washington
- Response deadline
- Sep 21, 2026 Closed
- Date posted
- Aug 28, 2026
- Source
- Open notice
Description
NRCS Washington is soliciting proposals to repair the Kalispel Tribe Dike located in Pend Oreille County, Washington. This project consists of dewatering the site, providing erosion control, excavating the existing dike soil and stockpiling, removing the 36" diameter dike culvert and anti-seep collars, if in suitable condition, as determined by the COR, resetting the existing dike culvert and anti-seep collars, placing riprap and nonwoven geotextile around the culvert outlet, backfilling and compacting the dike. If the existing 36" diameter dike culvert and anti-seep collars are not salvageable, then a new 36" diameter culvert and anti-seep collars will be installed as specified. SITE VISIT: The Site Visit will take place on September 10, 2026, at 10:00am PT. SITE VISIT LOCATION: Kalispel WRP Dike, Pend Oreille County, Washington Section 25, T33N, R43E Lat: 48.329193, Long: -117.311591 Quotes will be due on September 21, 2026 by 2:00pm PT. The magnitude for this project is between $250,000 and $500,000.
Classifications
Documents (5)
- C04 12FPC326B0016 Attachment 3 Kalispel Dike Repair_Construction and Material Specs.pdf.pdf638 KBNot yet available
- C04 12FPC326B0016 Solicitation.pdf.pdf605 KBNot yet available
- C04 Attachment 4 12FPC326B0016 Wage Determination.pdf.pdf65 KBNot yet available
- C04 12FPC326B0016 Attachment 2 Kalispel Dike Repair_Drawings_stamped.pdf.pdf692 KBNot yet available
- C04 12FPC326B0016 Attachment 1 Starement of Work.pdf.pdf829 KBNot yet available
Contacts
- bobby.copenny@usda.gov8175093503
Similar contracts
- LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)LouisianaDue Oct 27, 2026
- Industry Day - Selma AL Flood Management Risk and BankAlabamaDue Oct 28, 2026
- Section 219 Chesterton Interceptor Rehab
- Camp Wooten/Starbuck Levee RehabWashingtonDue Oct 30, 2026
- Sources Sought: Liberty State Park Ecosystem Restoration Project, Jersey City, NJNew JerseyDue Oct 30, 2026
- Sources Sought Wood River Relief Wells ConstructionDue Oct 28, 2026