Federal Regional Center Supply Fan Upgrades
- Response deadline
- Sep 9, 2026 Due in 7 days
- Date posted
- Sep 1, 2026
- Source
- Open notice
Description
FEMA Region 10 requires replacement of its outdated 1967 air handling units with a modern QPAC Fan Array System. The project includes removing existing single-fan assemblies, installing multiple direct-drive fan modules with variable frequency drive controls, integrating with the building automation system, and performing testing and commissioning. This upgrade will improve energy efficiency, reliability, and airflow control while reducing maintenance needs. This is a combined synopsis/solicitation for services as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation WILL NOT be issued. The solicitation number is 70FBR026Q00000101. This is a combined sysopsis solicitation as per FAR 2025-06. Please note that any solicitation package materials, documents, drawings, specifications, and/or attachments to the anticipated solicitation will be available only electronically and via the government point of entry found at SAM.gov. Hard copy documents will not be supplied by the government to any interested parties as a result of this solicitation. Vendors submitting quotes to this requirement must be actively registered in the System for Award Management (SAM) to participate; quotes received from vendors that are not currently registered will be rejected. Website: http:www.sam.gov Quotes must be submitted by the required deadline to the point of Contact listed via email. Onsite visit required prior to award and to take place on September 4, 2026 at 10AM PST. Arrangements must be made to attend site visit 24 hours in advance with Richard Albidress at Richard. Albidress@fema.dhs.gov. Reference attached Statement of Objective. The Government will evaluate Offeror’s proposal submissions based on Best Value and the following evaluation factors, listed in descending order of importance: • Factor 1 – Technical Approach/Capability and Prior Relevant Experience • Factor 2 – Management Approach including Capability of Proposed Key Personnel • Factor 3 – Past Performance • Factor 4 – Price When combined technical factors 1-3 are equal in weight to price.
Classifications
Documents (1)
- Statement of Objectives FRC Supply Fan Upgrades PDF.pdf.pdf98 KBNot yet available
Contacts
Similar contracts
- Fi-Mue Infrastructure Lifecycle Replacement for the 41St Strategic Signal BattalionGyeonggiDue Sep 14, 2026
- Jacksonville Air Route Traffic Control Center (ARTCC) Chiller Repair ProjectFloridaDue Sep 14, 2026
- J--Modify Humidification System at OKXNew YorkDue Sep 8, 2026
- Boiler Inspection and RepairsMarylandDue Sep 11, 2026
- Miami HVAC Repair/ReplacementDue Sep 15, 2026
- Fire Sprinkler Repair B1 and B2- Athens, GAGeorgiaDue Sep 24, 2026