SAM.gov140R1026B0001
Open
Y--Steamboat Rock State Park Shoreline Stabilization
- Response deadline
- Jul 22, 2026 Closed
- Date posted
- Jul 6, 2026
- Source
- Open notice
Description
The General intent of this work is to protect the existing bank slopes from further erosion.
Classifications
Documents (12)
- DownloadSol_140R1026B0001_Amd_0002.pdf.pdf208 KB
- DownloadJ_5__Specs_(180_Pages).pdf.pdf3.5 MB
- DownloadJ_1__Wage_DOL_No__WA20260045_Grant_05_18_26_(6_pages).pdf.pdf274 KB
- DownloadJ_3__Drawing_Binder_11_x_17_(12_pages).pdf.pdf7.4 MB
- DownloadSol_140R1026B0001.pdf.pdf291 KB
- DownloadSolicitation_140R1026B0001_-_Site_Visit_Roster_6-16-26_0001.pdf.pdf19 KB
- DownloadJ_2__Bid_Bond_(4_pages).pdf.pdf152 KB
- DownloadSteamboat_Q_A_Log_0002.pdf.pdf132 KB
- DownloadJ_5__Specs_Revised_(180_Pages)_0002.pdf.pdf3.9 MB
- DownloadJ_4__Permits_Combined_(77_pages).pdf.pdf10.5 MB
- Download140R1026B0001_Solicitation_(Steamboat).pdf.pdf1.8 MB
- DownloadSol_140R1026B0001_Amd_0001.pdf.pdf202 KB
Contacts
- mnaseath@usbr.gov2083785027
Similar contracts
- Design-Bid-Build, Dredging at JEBLC Fuel Pier and Anzio Beach Sandbar, and JEBFS Utah Beach Sandbar, Joint Expeditionary Base Little Creek - Fort Story, Virginia Beach, VADue Sep 1, 2026
- Fy26 Houston Ship Channel, Texas Bayport Flare Hopper DredgingDue Oct 2, 2026
- Chickasaw County, Mississippi, Mississippi Delta Headwaters Project, Bank Stabilization 23-01
- NAICS 237990 PSC Y1PZ--CONS: 909CM3030 Fort Custer NC - Cemetery Expansion and Site ImprovementsMichiganDue Sep 17, 2026
- Sand Trail Phase IIAlaskaDue Sep 10, 2026
- Gulf Intracoastal Waterway, Texas High Island to Causeway and Channel to Port Bolivar Pipeline Maintenance DredgingTexasDue Sep 15, 2026