Civic AI
Civic AI
Procurement intelligence
OpenGov / IonwavePW#2025-077
Open

W Magnolia S PF Lighting Replacements

Response deadline
Oct 21, 2026
Due in 20 days
Date posted
Sep 30, 2026

Description

Project Description: 1. Demolish and haul existing wooden flood light poles to Parks designated park facility, demolish and haul floodlights, leave existing conduit in place. Existing wood poles appear to be treated poles possibly Pentachlorophenol, or Penta Chromated Copper Arsenate, or CCA. This should be confirmed by contractor testing and appropriately disposed of. Refer to 01 74 19 Construction Waste Materials and Disposal and 02 41 13 Selective Site Demolition for the disposal of wooden flood light poles and potentially contaminated soils. 2. Provide new floodlight poles, shielded LED floodlights, conduit, wiring, junction boxes and receptacles. Replace existing electrical panels, provide new circuit breakers, lighting control panel to accommodate new shielded LED floodlights. Tree pruning will be required by the contractor to accommodate lighting operation and installation. Engineer's Estimate: $1,219,433.60 Project Location: Magnolia Playfield 2518 34th Ave W, Seattle, WA 98199

Documents

No documents posted for this opportunity.

Similar contracts

Explore more