W Magnolia S PF Lighting Replacements
- Response deadline
- Oct 21, 2026 Due in 20 days
- Date posted
- Sep 30, 2026
- Source
- Open notice
Description
Project Description: 1. Demolish and haul existing wooden flood light poles to Parks designated park facility, demolish and haul floodlights, leave existing conduit in place. Existing wood poles appear to be treated poles possibly Pentachlorophenol, or Penta Chromated Copper Arsenate, or CCA. This should be confirmed by contractor testing and appropriately disposed of. Refer to 01 74 19 Construction Waste Materials and Disposal and 02 41 13 Selective Site Demolition for the disposal of wooden flood light poles and potentially contaminated soils. 2. Provide new floodlight poles, shielded LED floodlights, conduit, wiring, junction boxes and receptacles. Replace existing electrical panels, provide new circuit breakers, lighting control panel to accommodate new shielded LED floodlights. Tree pruning will be required by the contractor to accommodate lighting operation and installation. Engineer's Estimate: $1,219,433.60 Project Location: Magnolia Playfield 2518 34th Ave W, Seattle, WA 98199
Documents
No documents posted for this opportunity.
Similar contracts
- Priority Curb RampsWADue Oct 14, 2026
- Garfield Superblock Renovation- Softball FieldWADue Oct 7, 2026
- Seattle City Hall (SCH) Roof and Windows ReplacementWADue Sep 23, 2026
- SS4A Package 1: STM ScopeWADue Sep 16, 2026
- Lower Woodland #4 and Fairmount Playground Infield ConversionWADue Sep 16, 2026
- Central West Headquarters Electrical Service RelocationWADue Sep 2, 2026