Submersible Connectors NCC Thermal Spray
- Response deadline
- May 22, 2026 Closed
- Date posted
- May 15, 2026
- Source
- Open notice
Description
SCOPE: Trident Refit Facility Bangor (TRFB) performs maintenance, repairs, modernization modifications, and restoration of SSBN 726 Class Submarines. To fulfill mission requirements, organic fabrication of electrical cable assemblies that are exposed to submergence sea pressure is required. To meet submersible cable assembly manufacturing requirements of Reference 2.1, the associated submersible cable connectors that are molded into submersible cable assemblies must be coated with a Non-Conductive Coating (NCC) applied via Plasma Spray (Thermal Spray) to the requirements of Reference 2.2. Current baseline conditions: Thirty-nine National Stock Numbered (NSN) electrical connectors have been received from Navy Supply without the required application of NCC. Period of Performance: 12 June 2026 through 12 August 2026.
Classifications
Documents
No documents posted for this opportunity.
Similar contracts
- POWERPACK, ELECTRODue Aug 24, 2026
- POWERPACK, ELECTRODue Aug 24, 2026
- SSTG Lift Rod Thermal SprayWashingtonDue Aug 26, 2026
- Hot Dip Galvanizing of Metal PalletsDue Aug 12, 2026
- Thermion feeder assemblyDue Aug 13, 2026
- DEBURRING AND POLISHING MACHINEVADue Jul 17, 2026