Irving Peak White River Road Repairs
- Response deadline
- Aug 20, 2026 Closed
- Date posted
- Jul 21, 2026
- Source
- Open notice
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 1240BJ26Q0022 is issued as a Request for Quotation (RFQ) for construction work associated with repairing roads in and below the burn scar of the White River and Irving Peak Wildfire on the Wenatchee River Ranger District of the Okanogan-Wenatchee National Forest in Chelan County, Washington. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237310. The small business size standard is $45,000,000.00 This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
Classifications
Documents (9)
- C04_2_Attachment6-FirePlan-FormR6-FS-6300-55.pdf.pdf78 KBNot yet available
- C04_2_Attachment3_WageDetermination.pdf.pdf218 KBNot yet available
- C04_2_Attachment4_CampingPermit.docx.docx15 KBNot yet available
- C04_2_Attachment1_WhiteRiverIrvingPeakRdRepairDrawings.pdf.pdf16.4 MBNot yet available
- C04_3_Bid_Bond_SF24.pdf.pdf703 KBNot yet available
- C04_2_Attachment2_FSSS_WhiteRiverIrvingPeakRdRepair.docx.docx250 KBNot yet available
- C04_1_RFQ_1240BJ26Q0022.pdf.pdf1.1 MBNot yet available
- C04_2_Attachment5-FireProtectionSuppression.rtf.rtf183 KBNot yet available
- C04_3_Quote_Template.docx.docx45 KBNot yet available
Contacts
Similar contracts
- Notice of Intent (NOI) to Sole Source for SAFB Taxiway Repairs at SAFB, ILIllinoisDue Oct 14, 2026
- CO NP BLCA 10(1) South Rim DriveColoradoDue Oct 8, 2026
- Opportunity Available to NM FERM BPA Zone 1 Contractors ONLY with the USDA Forest ServiceNew MexicoDue Oct 22, 2026
- Bonneville Lock and Dam - Navigation Lock 1 Bridge ReplacementOregonDue Oct 8, 2026
- Sidewalk Replacement Throughout Lyons CampusDue Oct 9, 2026
- Airfield Civil Works IDIQDue Oct 5, 2026