FS 31 Interim Decommissioning
- Response deadline
- Sep 16, 2026 Due in 34 days
- Date posted
- Aug 12, 2026
- Source
- Open notice
Description
Project Description: The project consist of demolition of temporary site and building improvements associated with an interim fire station and restoration of the site to its previous use as a fenced gravel parking lot with a small play area. The work includes demolition and removal of two (2) tensile fabric tents (3,880 SF), concrete tent foundations, the support system under the modular buildings, fencing, utilities, paving, and storm drainage components, and site restoration including grading, gravel surfacing, fencing, play area with engineered wood fiber, concrete paving, and extensions to the storm drainage system. Bidder will coordinate access for the modular building removal by others if Alternate (Additive) No. 1 is not awarded. Alternate (Additive) No. 1: Demolish and dispose of modular buildings. Engineer's Estimate: Base Bid - $921,198.00 Alternate (Additive) No. 1 - $164,231.00 Project Location: 10503 Interlake Ave N, Seattle, WA 98133
Documents
No documents posted for this opportunity.
Similar contracts
- Central West Headquarters Electrical Service RelocationWADue Sep 2, 2026
- (RE-BID) Meridian Play Area Renovation and ADA Meridian RR DesignWADue Sep 2, 2026
- Central West Headquarters Re-RoofWADue Aug 19, 2026
- REBID Seattle City Hall Plaza Waterproofing ReplacementWADue Sep 2, 2026
- Water Main Rehab Package 6 - NorthWADue Aug 5, 2026
- 4th Ave S Over ARGO Bridge RepairWADue Aug 5, 2026