Civic AI
Civic AI
Procurement intelligence
OpenGov / IonwavePW#2026-016
Open

FS 31 Interim Decommissioning

Response deadline
Sep 16, 2026
Due in 34 days
Date posted
Aug 12, 2026

Description

Project Description: The project consist of demolition of temporary site and building improvements associated with an interim fire station and restoration of the site to its previous use as a fenced gravel parking lot with a small play area. The work includes demolition and removal of two (2) tensile fabric tents (3,880 SF), concrete tent foundations, the support system under the modular buildings, fencing, utilities, paving, and storm drainage components, and site restoration including grading, gravel surfacing, fencing, play area with engineered wood fiber, concrete paving, and extensions to the storm drainage system. Bidder will coordinate access for the modular building removal by others if Alternate (Additive) No. 1 is not awarded. Alternate (Additive) No. 1: Demolish and dispose of modular buildings. Engineer's Estimate: Base Bid - $921,198.00 Alternate (Additive) No. 1 - $164,231.00 Project Location: 10503 Interlake Ave N, Seattle, WA 98133

Documents

No documents posted for this opportunity.

Similar contracts

Explore more