OpenGov / IonwavePW#2025-017
Open
45th Ave SW Culvert Replacement and Habitat Restoration
City of Seattle — Public Works · WA
- Response deadline
- Jul 29, 2026 Due in 10 days
- Date posted
- Jun 24, 2026
- Source
- Open notice
Description
Project Description: This Project will replace the 45 th Ave SW culvert and consists of the following elements of Work: civil demolition to include an in-stream by-pass, tree protection, civil site work, civil stream work, civil grading, civil utilities (drainage and water), civil paving (roadway), landscaping, structural work (soldier pile shoring, culvert construction consisting of cast-in-place concrete footings, shotcrete walls, and precast concrete cover), and electrical. Engineer's Estimate: $30,250,000 Project Location: T his Project is located in southwest Seattle along where Fauntleroy Creek crosses 45 th Ave SW, between SW Director St on the north and SW Wildwood Pl on the south
Documents
No documents posted for this opportunity.