Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation
- Response deadline
- Nov 30, 2026 Due in 54 days
- Date posted
- Oct 7, 2026
- Source
- Open notice
Description
Pre-Solicitation - W912EK27BA003 - Detroit Project Office Detroit, MI Wayne County Roads, Parking, and Grounds Renovation Completion Days: 365 Consecutive Calendar Days NAICS 237310 8(a) Competitive IFB The project includes, but is not limited to mobilization and demobilization; demolition to include removal of asphalt and concrete pavements, curbs and gutters, sidewalks and slabs, water main, valve and hydrant, storm sewer inlets, manholes and pipe, chain-link and ornamental fencing and gates, and flagpole; earthwork to include stripping, excavation, placement of backfill, compaction, and grading; water main and storm sewer work; aggregate work; asphalt paving; concrete paving, sidewalks, steps and light pole bases; installation of new metal handrail; installation of new ornamental fencing and electric pivot gate; electrical work to include installation of new conductors, new utility rack, new electric gate controls with keypad, intercom, camera and monitoring station, and new exterior pole lighting; installation of new pipe bollards;installation of new flag pole; pavement markings; damaged turf repair; seeding; and site restoration. ETA for IFB is within 30-60 days.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- ND NP THRO 204(1) Buck Hill RoadNorth DakotaDue Nov 3, 2026
- Z--Rdo_Tioga Bridge RehabilitationDue Oct 15, 2026
- Cisco Branch Ontonagon River Bridge ReplacementMichiganDue Oct 26, 2026
- WWYK100209-Repair Perimeter Dr and Industrial BlvdOklahomaDue Oct 30, 2026
- Z--GOGA 336173 - Repair Conzelman RoadDue Oct 29, 2026
- Z--YELL 338223 - Bridge PreservationDue Oct 30, 2026