SAM.govW912EK26BA014
Open
Mississippi River Basin Lock and Dam 21 Quincy, Il Bolted Tainter Gate Fabrication
- Response deadline
- Sep 17, 2026 Closed
- Date posted
- Aug 18, 2026
- Source
- Open notice
Description
USACE - Rock Island - This project involves the fabrication and delivery of new bolted Tainter gates for Lock and Dam 21. The work includes the off-site fabrication of tainter gates, measuring approximately 20 feet high by 64 feet long, which are comprised of cold-rolled shapes and welded assemblies. These welded assemblies must comply with AWS D1.1 standards and are designed without fracture-critical members to enhance structural reliability.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- Bushing, Machine ThreadDue Oct 23, 2026
- Wheel Well StandsOklahomaDue Oct 28, 2026
- USACE LRD Various Metal Fabrication, Refurbishment, and Installation ProjectsDue Nov 2, 2026
- Baffle, Fluid Cooler, inDue Oct 26, 2026
- Debris Boom Supply and Install at Harry S. Truman Lake ProjectMissouriDue Oct 26, 2026
- Expansion Joint, PipeDue Oct 23, 2026