W912CH-26-B-A020 for Control Module System; NSN:4240-01-333-3919
- Response deadline
- Oct 12, 2026 Due in 17 days
- Date posted
- Sep 25, 2026
- Source
- Open notice
Description
INDUSTRY FEEDBACK IS IMPORTANT PLEASE RESPOND! The Army Contracting Command - Detroit Arsenal (ACC-DTA) is seeking to gain knowledge of interest, capabilities, and qualifications of various members of the community, to include both small and large businesses, for production of the military-unique component listed below. Control Module System NSN: 4240-01-333-3919 Part No. 5-19-9118 FAT: Is Required Responses to this survery will assist ACC-DTA in planning for a potential contract. Interested vendors are encouraged to complete the survery located under "Attachments/Links" and then return it via e-mail to: George Campbell Contract Specialist, ACC-DTA EMAIL: george.l.campbell45.civ@army.mil Subject Line: Assembly Control Panel Survey Response You may respond in total, or in part, to the survey. However, all responses must be received no later than 3:00 p.m Eastern Standard Time (EST) on Monday, 12-Oct-2026. PLEASE NOTE: The associated Technical Data Package (TDP) will only be made available to vendors that have a valid DD 2345.
Classifications
Documents (2)
- Sources Sought Notice Control Module System.docx.docx40 KBNot yet available
- Army Package - TPP-Control Module System.zip.zip28.5 MBNot yet available
Contacts
- george.l.campbell45.civ@army.mil(571) 588-1547
Similar contracts
- Request for Information (RFI), Attenuator, Variable , NSN: 5985-01-129-5991Due Jul 10, 2026
- U.S. Army Contracting Command � Detroit Arsenal (ACC-DTA) Strategic Services Branch Commercial Solutions Opening (CSO)MIDue Jun 30, 2030
- U.S. Army Contracting Command � Detroit Arsenal (ACC-DTA) Strategic Services Branch Commercial Solutions Opening (CSO)MIDue Jun 30, 2030
- Solicitation, Simulator, Valve, NSN: 4931-01-495-9541Due Jul 27, 2026
- U.S. Army Contracting Command � Detroit Arsenal (ACC-DTA) Strategic Services Branch Commercial Solutions Opening (CSO)MIDue Jun 30, 2030
- Solicitation - Air Breathing Hose AssemblyKYDue Jul 2, 2026