W9126G26RA106
- Response deadline
- Aug 18, 2026 Due in 5 days
- Date posted
- Aug 3, 2026
- Source
- Open notice
Description
SUBJECT: CAMPSITE SHELTER REPLACEMENT, CANYON LAKE, TEXASDESCRIPTION: PROPOSED SOLICITATION NUMBER - W9126G26RA106, POSTED ON OR ABOUT 18 AUGUST 2026. CLOSING RESPONSE DATE: PRE-SOLICITATION CLOSE DATE OF 18 AUGUST 2026; ESTIMATED SOLICITATION CLOSING DATE OF 18 SEPTEMBER 2026. DESCRIPTION: The Contractor shall remove and replace thirteen (13) shelters at Potters Creek Park as shown on PWS Attachment A. Shelters shall be placed at camp sites 68-71, 73, 75-79, and 81-83. The Contractor shall remove and replace twelve (12) shelters at Potters Creek Park as shown on Attachment B. Shelters shall be placed at Campsites 84-88 and 98-104. The Contractor shall remove and replace two (2) shelters at North Park as shown on Attachment C. Shelters shall be placed at the two (2) Gate Attendant sites. The work includes providing, delivering, and installing brown-colored steel campsite shelters with two (2) posts, steel campsite shelters with gable roof, integrated table and benches, and all associated hardware. The work shall include site preparation (area clearing, picnic shelter demolition, foundation preparation and construction, and erection of metal structure).
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- EXTERIOR UPGRADE, FRANKFURTDue Aug 31, 2026
- Fort Benning Job Order Contract (JOC)GeorgiaDue Aug 26, 2026
- DB VEHICLE MAINTENANCE FACILITY, BASA AIR BASE, PHILIPPINES. Due Sep 14, 2026
- (SOL. Amendment) MATOC WP_W90VN726RA024_Repair Roof Contingency SQ Ops, B2548Due Aug 21, 2026
- 657-26-602 Create Observation Unit JCMissouriDue Sep 1, 2026
- AMENDMENT 0001 - 19KU2026Q0012: Chancery Annex Restroom, Lactation RM &Locker RMs RenovationḨawallīDue Aug 20, 2026