SAM.govW9123726QA100
Open
Bulkhead Crane Bus Rails Replacement at Captain Anthony Meldahl Locks and Dam
- Response deadline
- Sep 21, 2026 Due in 12 days
- Date posted
- Sep 9, 2026
- Source
- Open notice
Description
This requirement is to furnish all labor, equipment, and materials to remove the existing Bulkhead Crane bus rail system and furnish and install a new four-bar, 500-amp aluminum bus rail system consisting of three-phase, 480V power with ground, approximately 1,400 feet per bar, including associated hardware, eight (8) new collector shoes, and electrical expansion couplings. Repair or replace approximately 50 percent of the existing protective bus rail covers, supports, and associated hardware, and modify existing covers as necessary to provide complete coverage of the new bus rail system.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
Similar contracts
- Audio Visual Equipment Installation New SATCOM FacilityOkinawaDue Sep 15, 2026
- FY26 LSS Cubicles electrical and IT wiring in CCRU FacilityWisconsinDue Sep 22, 2026
- Cable Fiber Install ATC Tower Dobbins ARBGeorgiaDue Sep 18, 2026
- CSS 99154 Upgrade Existing Lighting to LEDDue Sep 15, 2026
- 641 Replace LightingIndianaDue Sep 15, 2026
- D--NETWORK CABLING InstallationDue Sep 14, 2026