W50S8126BA012
- Response deadline
- Sep 29, 2026 Due in 32 days
- Date posted
- Aug 27, 2026
- Source
- Open notice
Description
THIS PROJECT REQUIRES ALL LABOR, TOOLS, EQUIPMENT, MATERIALS, TRANSPORTATION, ENGINEERING, AND SUPERVISION TO PERFORM UTILITY ROUTING FOR PROJECT AXQD242790, ALLIED SUPPORT SUNSHADES UTILITY INFRASTRUCTURE, AT 104 FW, BARNES ANGB, WESTFIELD, MA 01085. SCOPE: ESTABLISH A SECURE, REDUNDANT UNDERGROUND UTILITY CORRIDOR FOR 480V POWER AND OSP FIBER TO TWO TIE-IN POINTS. WORK INCLUDES APPROXIMATELY 800 LF OF HORIZONTAL DIRECTIONAL DRILLING, HDD, UNDER AIRFIELD PAVEMENTS AT MINIMUM 8 FT DEPTH; PRIMARY CIRCUIT TIE-IN SPLICING INTO 22.9KV BASE LOOP IN MANHOLE 110, EMH 110, WITH IEEE 386 200A ELBOWS; INSTALLATION OF ONE PAD-MOUNTED TRANSFORMER, 22.9KV PRIMARY TO 480Y/277V SECONDARY, 250KVA, ON FROST-PROTECTED CONCRETE PAD; BACKUP SYSTEM WITH 400A NEMA 3R MANUAL TRANSFER SWITCH AND CANNON PLUG RECEPTACLE; AND NEMA 3R/4X COMMUNICATIONS CABINET WITH FIBER PATCH PANELS. WORK ALSO INCLUDES AIRFIELD PAVEMENT RESTORATION, REMARKING PER UFC 3-260-04, PE-STAMPED LOAD STUDY, AND QUALITY LEVEL B SUE UTILITY SCAN. NAICS CODE 237130 APPLIES. MAGNITUDE IS BETWEEN $250,000 AND $500,000. A SINGLE-AWARD FFP CONTRACT IS CONTEMPLATED WITH A 90-CALENDAR-DAY POP. FAILURE TO BID ON ALL CLIN ITEMS RESULTS IN REJECTION. SOLICITATION, NOTICES, AND AMENDMENTS WILL BE POSTED AT HTTPS://PIEE.EB.MIL. SECURED PLANS INSTRUCTIONS ARE IN THE SOLICITATION. AWARD WILL BE MADE TO THE LOWEST RESPONSIVE BIDDER WHOSE BID CONFORMS TO THE INVITATION FOR BIDS.
Classifications
Documents (1)
- attachmentNot yet available
Contacts
- kristen.phipps@us.af.mil8653363353
Similar contracts
- SP-364 Replace Underground Cabling in SP Area Due Sep 7, 2026
- N--AMIS DIABLO EAST RADIO TOWERTexasDue Sep 4, 2026
- Fiber Optic Cabling & InstallationDue Sep 8, 2026
- Building refurbishment in Hutchinson, KS at the HTI ARSRKansasDue Sep 14, 2026
- Feeder 7 RepairDue Sep 8, 2026
- Y--COMMUNICATIONS SITE INFRASTRUCTURE IDIQDue Sep 10, 2026