Village School Stormwater Mitigation Project
- Response deadline
- Jul 31, 2026 Due in 17 days
- Date posted
- Jul 13, 2026
- Source
- Open notice
Description
The project includes the following Work: Installation of a subsurface stormwater infiltration system beneath the former school's basketball courts, located at 47 Mechanics Street in the Town of Castleton. The new system will be supported by a new catch basin, three new stormwater manholes, two new overflow diversion structures, and all associated stormwater piping. Keywords: Construction (Non Building), Concrete, Paving Contractor, Storm Water System Design Locations: Rutland Site visit: 7/22/2026 9:00:00 AM A pre-bid conference for the project will be held on Wednesday July 22nd at 9:00 AM, at the Castleton Town Office, 263 Route 30 North, Bomoseen, VT 05732. A site visit will follow. Attendance at the pre-bid conference is encouraged but not required.
Classifications
Documents (1)
- 2 Advertisement to Bid 2018.pdfNot yet available
Contacts
- Fuss & O'Neill Inc., attn: Brian Bertsch PEbrian.bertsch@fando.com(802) 3047532