Town of Barnet Flood Recovery Projects - Design and Construction Oversight Services
- Response deadline
- Jul 13, 2026 Due in 3 days
- Date posted
- Jun 19, 2026
- Source
- Open notice
Description
The Town of Barnet is requesting proposals for design and construction oversight services for the replacement of structures damaged or destroyed during the July 2024 flood events. The projects are as follows: Bridge #34 Replacement over Simpson Brook, Town Forest Road, (Lat.44.37456, Long. -72.02517), currently temporary 10-foot diameter culvert, previously 25’L x 20’ wide concrete slab deck bridge. Bridge #41 Replacement over the Stevens River, Carter St., (Lat. 44.29469, Long. -7205071). (33’L x 23’W steel girder with concrete deck). Damaged girders and undermined north abutment. Bridge #44 Replacement over the Stevens River, Patneaude Lane (Lat. 44.30211, Long. -72.06593). Currently temporary one lane Mabey Bridge, previously (33’L x 16’ W) For full details visit barnetvt.org. Email townclerk@barnetvt.org with questions. Keywords: Architect and Engineering (Non-Building) Locations: Caledonia
Classifications
Documents (1)
- BarnetRFP_FloodRecovery_DesignandConstructionOversightServicNot yet available
Contacts
- Benjamin P. Heisholttownclerk@barnetvt.org(802) 633-2256