Lovers Lane Bridge
- Response deadline
- Sep 15, 2026 Closed
- Date posted
- Sep 15, 2026
- Source
- Open notice
Description
The Town of Moretown is seeking bids from bridge contractors to furnish, install, and remove an approximately 95-foot temporary one-lane bridge over the Mad River. The bridge will be installed over an existing out-of-service concrete bridge off Route 100B at the intersection of Hooper Lane and Lovers Lane Road, at coordinates 44.300084°N, 72.698448°W. Bids should include construction of paved approaches. The bridge will provide access for residents and emergency vehicles while Lovers Lane Road is closed for reconstruction. It is expected to be needed from 12/1/26 to 10/31/27. Bids are due 9/15/26 at 11:00 AM at the Moretown Town Office. E-mailed bids will be accepted. Please contact Rae Washburn III at r.washburn@onpointconsultingvt.com for bid documents. This is a FEMA funded project. All questions should be submitted in writing to Rae at the above address by 4:00 PM, 9/8/26. Keywords: Bridge Repair and Construction Locations: Washington
Classifications
Documents
No documents posted for this opportunity.
Contacts
- r.washburn@onpointconsultingvt.com(802) 882-8218
Similar contracts
- Mt. Holly Er P23-1(334)VTDue Oct 30, 2026
- Maintenance of Bridge 12 Over East CreekVTDue Aug 10, 2026
- Bridge #34 RehabVTDue Aug 5, 2026
- Tunbridge Flint Covered Bridge RepairVTDue Aug 6, 2026
- Barnet WCRL(26) & (27)VTDue Sep 18, 2026
- Chester REGM2345 & REGM2346VTDue Oct 9, 2026